Baoxu Yan

Dr. Baoxu Yan

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
BYBaoxu Yan
Baoxu Yan
WZWancheng Zhu
Wancheng Zhu
Chen HouChen Hou
Chen Hou
Erol YilmazErol Yilmaz
Erol Yilmaz
MSMahdi Saadat
Mahdi Saadat

1 November 2018 in Construction and Building Materials
Verified
Journal Article
Closed access
CHChen Hou
Chen Hou
WZWancheng Zhu
Wancheng Zhu
BYBaoxu Yan
Baoxu Yan
KGKai Guan
Kai Guan
JDJiafa Du
Jiafa Du

1 January 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
BYBaoxu Yan
Baoxu Yan
WZWancheng Zhu
Wancheng Zhu
Chen HouChen Hou
Chen Hou
YYYongjun Yu
Yongjun Yu
KGKai Guan
Kai Guan

1 July 2022 in International Journal of Geomechanics
Verified
Journal Article
Closed access
PDF file
WZWancheng Zhu
Wancheng Zhu
BYBaoxu Yan
Baoxu Yan
XLXige Liu
Xige Liu
ZYZhen Yang
Zhen Yang
KGKai Guan
Kai Guan
During underground mining excavation, dynamic disturbances (e.g., blasting) may accelerate rock creeping and induce unstable failure. It is crucial to properly quantify the impact of dynamic disturbances on creeping behavior to understand the long-term effects of underground excavation on rock media. A damage-based creep model was established in this study and implemented in Fast Lagrangian Analysis of Continua in 3D (FLAC3D) to quantify the damage and unstable failure of creeping rock triggered by dynamic disturbance. This model reveals the mechanical behavior of rock under creep-impact loading. It was verified by calculating the viscoelastic deformation around circular excavation, by reproducing the damage process under static loading, and by simulating the rock damage and failure under creep-impact loading. The model was then used to examine the mining-induced creep deformation around an operational shaft in Xincheng Gold Mine, China, where both the mining-induced creep of the country rock mass and dynamic disturbance of blast-induced vibration were considered. Numerical simulation indicated that the dynamic disturbance could accelerate the damage of rock under creep stress, which may be an important factor to trigger the accelerating creep of rock, even though the unstable failure of rock lagged behind the dynamic disturbance. The case study on the shaft stability analysis indicated that the dynamic disturbance could accelerate the time-dependent deformation of the shaft, the first dynamic disturbance induced much more shaft deformation, while in long-term creep (e.g., 5 years), the effect of blasting vibration was not significant. The trend and magnitude of shaft deformation agreed with the in situ measurements, which indicates that the numerical simulation could be used to predict the long-term shaft deformation in future.

1 April 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
Chen HouChen Hou
Chen Hou
WZWancheng Zhu
Wancheng Zhu
BYBaoxu Yan
Baoxu Yan
Kai GuanKai Guan
Kai Guan
JDJiafa Du
Jiafa Du

10 March 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
GZGengjie Zhu
Gengjie Zhu
WZWancheng Zhu
Wancheng Zhu
YFYou Fu
You Fu
BYBaoxu Yan
Baoxu Yan
Haiqiang JiangHaiqiang Jiang
Haiqiang Jiang