Time-synchronized state estimation for reconfigurable distribution networks is challenging because of limited real-time observability. This article addresses this challenge by formulating a deep learning (DL)-based approach for topology identification (TI) and unbalanced three-phase distribution system state estimation (DSSE). Two deep neural networks (DNNs) are trained for time- synchronized DNN-based TI and DSSE, respectively, for systems that are incompletely observed by synchrophasor measurement devices (SMDs) in real time. A data-driven approach for judicious SMD placement to facilitate reliable TI and DSSE is also provided. Robustness of the proposed methodology is demonstrated by considering non-Gaussian noise in the SMD measurements. A comparison of the DNN-based DSSE with more conventional approaches indicates that the DL-based approach gives better accuracy with smaller number of SMDs.
20 July 2020 in IEEE Transactions on Power Systems
During major power system disturbances, when multiple component outages occur in rapid succession, it becomes crucial to quickly identify the transmission interconnections that have limited power transfer capability. Understanding the impact of an outage on these critical interconnections (called saturated cut-sets) is important for enhancing situational awareness and taking correct actions. This paper proposes a new graph theoretic approach for analyzing whether a contingency will create a saturated cut-set in a meshed power network. A novel feature of the proposed algorithm is that it lowers the solution time significantly making the approach viable for real-time operations. It also indicates the minimum amount by which the power transfer through the critical interconnections should be reduced so that post-contingency saturation does not occur. Robustness of the proposed algorithm for enhanced situational awareness is demonstrated using the IEEE-118 bus system as well as a 17,000+ bus model of the Western Interconnection (WI). Comparisons made with different approaches for power system vulnerability assessment prove the utility of the proposed scheme for aiding power system operations during extreme exigencies.
30 April 2021 in IEEE Transactions on Power Systems
Ensuring reliable operation of large power systems subjected to multiple outages is a challenging task because of the combinatorial nature of the problem. Traditional approaches for security assessment are often limited by their scope and/or speed, resulting in missing of critical contingencies that could lead to cascading failures. This paper proposes a two-component methodology to enhance power system security. The first component combines an efficient algorithm to detect cut-set saturation (called the feasibility test (FT) algorithm) with real-time contingency analysis (RTCA) to create an integrated corrective action (iCA), whose goal is to secure the system against cut-set saturation as well as critical branch overloads. The second component only employs the results of the FT to create a relaxed corrective action (rCA) to secure the system against post-contingency cut-set saturation. The first component is more comprehensive, but the latter is computationally more efficient. The effectiveness of the two components is evaluated based upon the number of cascade triggering contingencies alleviated, and the computation time. The results obtained by analyzing different case-studies on the IEEE 118-bus and 2000-bus synthetic Texas systems indicate that the proposed two-component methodology successfully enhances the scope and speed of power system security assessment during multiple outages.
20 September 2019 in IEEE Transactions on Power Systems
With the growth of renewable generation (RG) and the development of associated ride through curves serving as operating limits, during disturbances, on violation of these limits, the power system is at risk of losing large amounts of generation. In order to identify preventive control measures that avoid such scenarios from manifesting, the power system must be modeled as a constrained dynamical system. For such systems, the interplay of feasibility region (man-made limits) and stability region (natural dynamical system response) results in a positively invariant region in state space known as the constrained stability region (CSR). After the occurrence of a disturbance, as it is desirable for the system trajectory to lie within the CSR, critical clearing time (CCT) must be defined with respect to the CSR instead of the stability region as is done traditionally. The sensitivity of CCT to system parameters of constrained systems then becomes beneficial for planning/revising protection settings (which impact feasible region) and/or operation (which impact dynamics). In this paper, we derive the first order CCT sensitivity of generic constrained power systems using the efficient power system trajectory sensitivity computation, pioneered by Hiskens in [1]. The results are illustrated for a single-machine infinite-bus (SMIB) system as well as a multi-machine system in order to gain meaningful insight into the dependence between ability to meet constraints, system stability, and changes occurring in power system parameters, such as, mechanical power input and inertia.
Traditional islanding detection schemes have mainly relied on voltage angle measurements obtained from PMUs for determining island formation. However, when placed in a network, PMUs measure both voltages and currents. In this paper, we test the hypothesis that better results can be obtained if other quantities measured by a PMU are also considered for islanding detection. Prior research considered device minimization as the primary objective for placing PMUs. An alternate formulation of the PMU placement problem that minimized total synchrophasor deployment cost has also been proposed recently. The second hypothesis that we test is if accuracies similar to what was observed with the device minimization objective are attained with the alternate formulation. Our results indicate that from a techno-economic perspective, better performance is realized if all the information provided by PMUs is used for decision making with the PMU locations computed using the alternate formulation.
The GRID-READY WIND project aimed to demonstrate the ability of utility-scale wind power plants (WPPs) to deliver traditional and emerging grid services (GSs) in both grid-following (GFL) and grid-forming (GFM) modes through a centralized control framework, supplemented by local control adjustments at the wind turbine generator as needed. Throughout the project, the team offered recommendations on how the grid services demonstrated with WPPs could be applied to other inverter-based resources (IBRs), such as photovoltaic (PV) systems and battery energy storage systems (BESS), while considering the unique dynamics of these resources arising from their energy generation characteristics. The project sought to enhance the confidence of system operators (SOs) and planners in utilizing WPPs, alongside other IBRs such as PV plants and BESS, to provide essential grid services over extended periods under diverse operating conditions, thereby supporting their integration into the bulk power system.