Senthil Krishnamurthy

Senthil Krishnamurthy


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 July 2023 in Mathematics
Verified
Journal Article
Open access
PDF file
OAOlukorede Tijani Adenuga
Olukorede Tijani Adenuga
SKSenthil Krishnamurthy
Senthil Krishnamurthy
The requirement for the integration of power plants due to the cyclical rise in electrical energy consumption is due to the fluctuating load demand experienced with the current grid systems. This integration necessitates effectively allocating loads to the power plants for a minimum grid-tied transmission line cost, while meeting the network constraints. In this paper, we formulate an optimization problem of minimizing the total operational cost of all committed plants transmitted to the grid, while also meeting the network constraints and ensuring economic power dispatch (EPD) and energy management system co-optimization. The developed particle swarm optimization (PSO) method resolves the optimization problem using a piecewise quadratic function to describe the operational cost of the generation units, and the B coefficient approach is employed to estimate the transmission losses. Intelligent adjustments are made to the acceleration coefficients, and a brand-new algorithm is suggested for distributing the initial power values to the generation units. The developed economic power dispatch strategy successfully demonstrated an imperative cost reduction, with a connected load of 850 MW, 1263 MW, and 2630 MW of power demand, contrasted with previous PSO application cost values percentage, maximum yearly cost savings of (0.55%, 91.87), (46.55%, 3.78), and (73.86%, 89.10), respectively, and significant environmental benefits. The proposed co-optimization approach can significantly enhance the self-consumption ratio compared to the baseline method.

4 July 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
OAOlukorede Tijani Adenuga
Olukorede Tijani Adenuga
SKSenthil Krishnamurthy
Senthil Krishnamurthy
The requirement for integration of power plants due to the cyclical rise in electrical energy consumption is due to fluctuating load demand with the current grid systems. This integration necessitates effective allocating loads to the power plants for a minimum grid-tied transmission line cost while meeting network constraints. In this paper, we formulate an optimisation problem of minimising the total operational cost of all committed plants transmitted to the grid while meeting network constraints and ensuring economic power dispatch (EPD) and energy management system co-optimization. The developed Particle Swarm Optimization (PSO) method resolve the optimisation problem using piecewise quadratic function to describe the operational cost of the generation units, and the B coefficient approach is employed to estimate the transmission losses. Intelligent adjustments are made to the acceleration coefficients, and a brand-new algorithm is suggested for distributing the initial power values to the generation units. The developed economic power dispatch strategy successfully demonstrated an imperative cost reduction with connected load of 850MW, 1263MW and 2630MW power demand are contrasted with previous PSO application cost values, maximum yearly cost savings of (0.55%, 91.87), (46.55%, 3.78), (73.86%, 89.10) respectively, and significant environmental-benefit. The proposed co-optimisation approach can enhance a significant self-consumption ratio compared to the baseline method.