A traditional power transmission system (TPTS) is composed of many electrical substations (ESs) and transmission lines. When the latter meet faults, the output of the ESs may be interrupted. In this paper, a methodology is proposed to construct controlled systems with battery energy storage systems to avoid the output interruption during the fault detection and restoration for some important ESs. In a TPTS, an important ES can be controlled by a supervisor that can be thought of as a control agent. Moreover, the ES can be preconnected with other ESs. If a fault occurs in the input lines of the ES, the fault can be detected by its supervisor and restored by its preconnected ESs. Furthermore, the ES can contain a battery energy storage system to store electric power for its temporary output during the fault detection and restoration. Therefore, the output interruption of the ES can be successfully avoided. This work formally models the structures of TPTSs and their control systems by using Petri nets and then verifies the correctness of fault detection and restoration. Finally, a case study is presented.
30 May 2018 in IEEJ Transactions on Electrical and Electronic Engineering
A power distribution system is usually composed of a number of distribution substations and distribution lines, where the latter are fragile and often suffer from faults, leading to serious local power shortages. For all distribution substations, it is complex and costly to diagnose and locate faulty input lines from the multiple input lines of distribution substations. This paper reports a Petri net strategy to diagnose the faulty input lines to prevent local power shortages. The structure of a supervisor is proposed to detect and locate the faulty input lines by supervising the variations of power loads that are stored in a battery energy storage system. The stored power loads can be uninterruptedly distributed to the output lines during the fault diagnosis processes. Moreover, there are other auxiliary distribution substations that can urgently supply power loads to a distribution substation once the faulty input lines of the distribution substation are diagnosed. The local power shortages of the distribution substation are prevented during the fault diagnosis processes. In addition, the structures of power distribution systems and their control systems are formally defined by using Petri nets. The derivation processes of fault detection and location strategies are verified by the mathematical methods of Petri nets. Finally, a case study is presented.
5 March 2024 in International Journal of Parallel, Emergent and Distributed Systems
As the important infrastructure of power transmission systems, the power transmission lines are vulnerable during the peak power transmission periods. They usually meet many faults that may cause large area blackouts because of heavy loads. This article proposes a supervisory control strategy to promote the detection and restoration of power transmission failures during the peak or off-peak periods. The faults occurring in power transmission lines can be detected, and fault restoration schemes can be selected by supervisors. Moreover, the architecture of distributed control systems is proposed to perform message switching among supervisors. A coordination protocol that is executed by each supervisor is proposed to selected fault restoration schemes. The proposed strategy can not only detect and restore power transmission failures but also improve the utilization rate of available loads in power transmission systems. The proposed distributed control systems and coordination protocol are modeled by synchronized Petri nets. The correctness of fault restoration is verified using the mathematical methods of Petri nets. Finally, the complexity of the proposed distributed control systems and coordination protocol is discussed, and a real-world example is given.
Air transportation as a public transport method is preferentially considered by passengers. However, this method will not only bring a congestion problem but also affect the passenger experiences in airport terminals during peak periods. Considering the fact that the capacities of airport terminals are proportional to their building costs, this paper proposes a scheme to calculate the minimum capacity for each airport terminal. The main purpose is to avoid the saturated congestion problems and reduce the waste of transition bus resources. For each airport terminal, its capacity is closely related with its inputs and outputs. The proposed scheme proves a relational expression for each airport terminal according to its inputs and outputs. Moreover, this work formally models the limited flow structures of flight process guidance systems by using finite capacity Petri nets and then verifies the correctness of the proposed relational expression. Finally, an example is presented to illustrate the proposed scheme.