We consider a Unit Commitment Problem (UCP) addressing not only the economic objective of minimizing the total production costs—as is done in the standard UCP—but also addressing environmental concerns. Our approach utilizes a multi-objective formulation and includes in the objective function a criterion to minimize the emission of pollutants. Environmental concerns are having a significant impact on the operation of power systems related to the emissions from fossil-fuelled power plants. However, the standard UCP, which minimizes just the total production costs, is inadequate to address environmental concerns. We propose to address the UCP with environmental concerns as a multi-objective problem and use a metaheuristic approach combined with a non-dominated sorting procedure to solve it. The metaheuristic developed is a variant of an evolutionary algorithm, known as Biased Random Key Genetic Algorithm. Computational experiments have been carried out on benchmark problems with up to 100 generation units for a 24 h scheduling horizon. The performance of the method, as well as the quality, diversity and the distribution characteristics of the solutions obtained are analysed. It is shown that the method proposed compares favourably against alternative approaches in most cases analysed.
24 November 2023 in U.Porto Journal of Engineering
The growing number of battery electric vehicles (BEV) and plug-in hybrid electric vehicles (PHEV) brings the need of more fast charging stations across cities and highway stops. This charging stations toned to be connected to the electrical grid via existent facilities, causing constraints such as power availability. This study brings an approach for the planning and operation of such energy hubs by coping with this challenge by deploying a Battery-based Energy Storage System (BESS). With the BESS integration, it is expected to minimize utilization and overall energy costs, preventing infrastructure upgrades, and enhancing the integration of renewable energy resources. This approach sizes a stationary energy storage system with lithium-ion technology batteries through a co-optimization of the planning and operation stages, integrated in an electrical installation that will implement fast charging stations. This sizing is a result of an optimization based on the interior point algorithm, where the objective is to minimize the costs of maintenance, operation, and installation of a BESS, while properly modelling the different resources such as the BESS, the charging station and EV charging and PV generation.