The U.S. Environmental Protection Agency’s Construction General Permit requires a 50 ft (15 m) undisturbed vegetated buffer to be maintained when construction activities are adjacent to a water body. However, maintaining a buffer is not always feasible, especially in highway construction activities; therefore, a contractor may use alternatives that capture sediment at an efficiency equivalent to an undisturbed buffer. However, little research has been conducted on the sediment removal efficacy of an undisturbed vegetated buffer. Several factors influence the sediment capture efficiency of a natural vegetated buffer, including climate, soils, topography, and vegetation characteristics. This research aimed to explore the sediment removal capabilities of various vegetated buffers with factors common to Nebraska roadway construction projects using the Revised Universal Soil Loss Equation 2 Model. A multiple linear regression model was developed to analyze relationships between 7,776 model iterations. Statistical analysis indicated that decreasing the slope of the buffer and the clay and silt content in the soil increased the sediment removal efficiency of the buffer; this finding matched the conclusions of past research on vegetated filter strips and vegetated buffers. Sediment removal ranged between 77% and 99%, with an average efficiency of 94%—comparable to the efficacy of manufactured sediment barrier practices commonly used on construction sites.
Sediment barriers are used on construction sites to protect downstream waterbodies from the impacts of sediment-laden stormwater runoff. Although ubiquitous on construction sites, many sediment barrier practices lack performance-based testing to determine effectiveness and treatment mechanisms, with previous evaluations being limited to conditions local to the Southeastern U.S., with conditions in other regions remaining untested. Testing was conducted to determine the effectiveness of woven silt fence barriers and provide structural improvements to common installation methods. Testing was conducted using a large-scale sediment barrier testing apparatus at the Auburn University—Stormwater Research Facility. The results from testing indicate that Nebraska DOT standard silt fence installations can be improved to reduce the risk of structural failures such as undermining, complete installation failure, slow dewatering, and overtopping. To improve structural performance, four modifications (a 15.2 cm [6 in.] offset trench, wooden posts, a dewatering board with an overflow weir, and a dewatering board with an overflow weir with adjusted post spacing) were tested. On average, 83% of introduced sediment was retained behind the tested barriers. The water quality results across the testing of standard and modified installations indicated that stormwater treatment was due to sedimentation within the impoundment formed by silt fence installations and not filtration through geotextile fabric.
12 November 2026 in Transportation Research Record: Journal of the Transportation Research Board
Ditch check practices, including rock check dams, are used on construction projects to slow runoff in channels to non-erosive velocities through impoundment formation. Despite the widespread use of rock check dams on highway construction projects, limited research has been conducted on performance improvement. This research aims to determine the effectiveness of the Iowa Department of Transportation standard rock check dam and develop efficient, cost-effective modifications through full-scale testing. Testing was conducted at the Stormwater Research Facility at Auburn University in a channel representative of Iowa highway construction roadsides with a bottom width of 10 ft (3.0 m) and a depth of 5 ft (1.5 m). The data collection included impoundment length and depth, flow velocities, and dewatering time. The results of the standard installation indicate little impoundment formed upstream, an average of 5.9 ft (1.8 m), showing that over 90% of the channel would be subjected to erosive flows. Increased performance and reduced costs were achieved through modifications. An installation with a removed excavation, a smaller rock gradation, a geotextile overlay with dewatering holes, and a reduced width along the flow direction increased average impoundment to 57.5 ft (17.5 m) and reduced approximate material cost by 55%. The additional impoundment formed due to the geotextile overlay also increased sediment capture during sediment-laden evaluations from 9.4% captured by the standard installation to 72.4% and lowered average discharge turbidity by 396 NTU. Implementing improved rock check dam installations will prevent soil loss in conveyance channels and reduce costs.