In 2020, China successfully conducted the second round of natural gas hydrate pilot production with horizontal wells at W11-W17 deposits in the Shenhu sea area of South China Sea, but the average daily gas production is far from reaching the commercial exploitation. Low productivity has become one of the key factors hindering the commercial exploitation of gas hydrate reservoir. This work taking SHSC-4 well as an example, uses numerical simulation method to analyze the impact of the placement of horizontal well section, length and the production system on productivity of horizontal well in depressurization exploitation. From the analysis of simulation results, it can be seen that the best performance of production capacity can be achieved when horizontal section placed in layer II, which is compared with that placed in layer I and III. More importantly, hydrate in layer I and free gas in layer III can be effectively utilized to improve productivity when layer II is exploited. When the horizontal section is arranged in layer II and produced by depressurization with small pressure difference (1 MPa), the longer the horizontal section length is, the better the productivity will be. However, the average cumulative gas production increment per meter is gradually decreasing. According to the simulation results, 300 m is a reasonable horizontal section length for the exploitation of layer II, and the cumulative gas production reaches 2.55 million cubic meters after 60 days of continuous exploitation. In addition, due to the limitations of convective heat transfer in the low-permeability reservoir in the Shenhu sea area, sensible heat can significantly improve the secondary hydrate generated in the wellbore and the reservoir around the wellbore due to throttling expansion effect, which has a good effect on productivity improvement. Compared with the situation without heating, when the horizontal section is arranged in layer II and the length is 300 m, the production mode of depressurization and combined heating is adopted, and the cumulative gas production of 60 days with different pressure difference (1–5 MPa) is 0.14, 5.55, 14.75, 23.72, and 29.5 times higher than that without heating.
Enhancing the production capacity of natural gas hydrates (NGHs) is critical for its commercial development. Complex structure wells may efficiently increase drainage areas while enhancing exploitation efficiency. Based on the field data of China’s first offshore NGH test production, the numerical method was used to analyze the production performance of different complex structure well types by continuous depressurization production for 360 days under the preconditions of fixed effective completion length of 300 m and a pressure difference of 6 MPa. Results indicated that the complex structure well types deployed at the three-phase layer demonstrated superior production performance within 240 days of production; the DLW2 and HW2 well types stood out, with an average gas production rate Qg reaching 43,333 m3/d and a specific production index J of 24.1. After 360 days of production, benefiting from multi-layer combined production, the Cluster vertical well deployed at the multi-layer had the best production performance, with an average Qg of 34,444 m3/d and a J-index of 19.1. The research results provided insights into the complex structure well-type selection strategy for NGH depressurization in this sea area.
Gas production efficiency is a key indicator in the commercial development of natural gas hydrates (NGHs). Based on the data from the first natural gas hydrate field test production in the Shenhu Sea area of China, the gas production capability of Class 1-type hydrate reservoirs was numerically evaluated by vertical well depressurization with different deployment schemes for radial laterals. The results showed that the radial laterals can effectively improve production efficiency and that the radial laterals deployed at the three-phase layer (TPL) have the best production performance. Compared with the single vertical well production, the completion length of the radial laterals is 150 m with a radius of 0.05 m, and the production pressure difference is set to 6 MPa. The cumulative gas production Vg reaches up to 594.10 × 104 ST m3, increased by about 208.53% after 360 days of production, which provides a reference for the development of natural gas hydrates with radial jet drilling (RJD) technology.
Stepwise depressurization is an important depressurization strategy in the development of natural gas hydrates. This work numerically analyzes the effects of different depressurization gradients and constant pressure durations on gas and water production during stepwise depressurization extraction with a vertical well in the Shenhu Sea area hydrate reservoir of the South China Sea. The results indicate that stepwise depressurization can reduce water production and raise the gas-to-water ratio in the early stages of production while ensuring cumulative gas output. When the vertical well is deployed at the model’s center with a completion length of 70 m and a constant pressure duration of 10 days, a depressurization gradient of 0.5 MPa, stepwise depressurization by 6 MPa, and continuous production for one year is achieved. Compared with direct depressurization, its cumulative gas production is 2.966 × 106 ST m3, which only decreases by 2.94%. However, it maintains a higher gas-to-water ratio in the early stages of production. Considering factors such as engineering operability, cumulative gas output, and gas-to-water ratio, it is recommended to use a small pressure gradient and a medium constant pressure stabilization time for stepwise depressurization Stepwise depressurization can maintain a high gas-to-water ratio while ensuring gas production and reducing water production can alleviate sand production problems and improve economic efficiency. The understanding gained from this work has reference value for the development of similar hydrate reservoirs worldwide.