Additive manufacturing (AM) has been recognised as a promising technology under the context of Industry 4.0, which is reshaping manufacturing paradigms. A prominent type of AM machine is the selective laser melting (SLM) machine, in which several parts may form a job and be produced concurrently. This paper aims to investigate a scheduling problem in an AM system with non-identical parallel SLM machines. Since, in this system, there might be differences in the material types of parts, the required setup time between two consecutive jobs on the relevant machine is dependent on their material types. Accordingly, a bi-objective mathematical model is extended for the problem, considering the makespan and the total tardiness penalty as two objective functions. Due to the high complexity of the problem, an efficient hybrid meta-heuristic algorithm is developed by combining the non-dominated sorting genetic algorithm (NSGA-II) with a novel learning-based local search founded on the k-means clustering algorithm and a regression neural network. The local search enhances the exploitation ability of the NSGA-II while intelligently being taught during the solving procedure. Finally, the superiority of the proposed hybrid algorithm is demonstrated through a computational experiment.
10 October 2014 in The International Journal of Advanced Manufacturing Technology
Rooted from the Industry 4.0 principles, Cloud Manufacturing (CMfg) is a novel customer-oriented manufacturing norm, which can assist enterprises to withstand in the nowadays highly volatile and competitive market. CMfg systems comprise two separate parties, namely, customers and factories, with independent individuals. In this regard, considering the utilities of both customers and factories and establishing the equity amongst their individuals are of particular importance for the survival and flourishment of CMfg systems. Furthermore, due to the limited capacity of resources, tightness of due dates, and customers’ cost expectations, all orders may not be accepted in CMfg systems. Accordingly, this paper aims to explore a scheduling problem in a CMfg system. A multi-objective mathematical model is presented for the problem, which can determine the acceptance or rejection of orders, set prices, and schedule them in an integrated manner to maximise the customers and factories’ utilities, and enhance the equity among their members. Due to the high complexity of the problem, two matheuristic methods based on the Multi-Objective Grey Wolf Optimizer (MOGWO) and Non-dominated Sorting Genetic Algorithm II (NSGA-II) are developed. An extensive computational experiment is carried out to validate the proposed matheuristic methods and evaluate their performance. Moreover, some guidance is presented for managers by conducting a sensitivity analysis.
24 June 2023 in International Journal of Production Economics