Gongfan Chen

Dr. Gongfan Chen

North Carolina State University, Raleigh, North Carolina, USA
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
Gongfan ChenGongfan Chen
Gongfan Chen
Min LiuMin Liu
Min Liu
YZYuXiang Zhang
YuXiang Zhang
ZWZhiGao Wang
ZhiGao Wang
SHSimon M. Hsiang
Simon M. Hsiang
CHChuanni He
Chuanni He
Reliable construction workflow relies on timely discovery, analysis, and checking of compliance with contract terms, which are time consuming and inefficient tasks. Smart contracts enabled by blockchain technology have demonstrated promise in addressing the inefficiencies of data communications due to their merits of traceability, immutability, transparency, and self-enforceability. However, a smart contract’s inability to interact with real-world data is the main issue that impedes further implementation. Today’s increasing availability of as-built data provides automatic condition assessments that have great potential to automate smart contract executions. This research area is uncharted territory for the industry. This research selects a case study to present an automatic decentralized management framework by exploring image-based deep learning solutions to automate and decentralize the conditioning of smart contract executions enabled by a web3.js-based decentralized blockchain application. It was found that the model can automate management intelligence with minimal workflow interruptions by timely identification of bottleneck activities and enforcement of mitigation strategies. Project managers can use the blockchain prototype to enhance information sharing, remove key risks, and enable a reliable workflow with minimal management efforts.

1 March 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
CHChuanni He
Chuanni He
Min LiuMin Liu
Min Liu
YZYuxiang Zhang
Yuxiang Zhang
ZWZhigao Wang
Zhigao Wang
SHSimon M. Hsiang
Simon M. Hsiang
GDGongfu Dai
Gongfu Dai
Workspace, project duration, and workforce are three critical resources for construction projects. Project managers need to expend time and effort reviewing, comprehending, and coordinating these resources. However, the space–time–workforce interactions and their impact on decision-making in project scheduling are not fully known. Therefore, the objectives of this research were to understand the impact of workforce shifts on space, time, and labor cost performances, develop a three-dimensional (3D) visualization tool to reveal activity-level resource dynamics, and associate the risk aftermath with the occurrence probability to balance subjective risk tolerance and objective system reliability. This research developed a simulation model based on a case project to compare the workflow of five major specialty trades (i.e., bar placer, carpenter, scaffolder, pipefitter, and concreter) in 267 scenarios. A resource-oriented 3D visualization tool was developed to help project managers monitor project schedules. The research established a risk control framework using value-at-risk (VaR) and conditional value-at-risk (CVaR) approaches to associate extreme outcomes with their occurrence probability. Simulation results indicated that pipefitters significantly affected workspace overlap, whereas bar placers and carpenters predominantly impacted project duration. The scholarly contributions are (1) the creation of an intelligent system to generate a project schedule from workforce assignments specified by project managers, (2) development of a tool to visualize the three-way resource dynamics of workforce, time, and space on a 3D model for all possible scenarios, and (3) development of a framework for project managers to balance planning strategies between subjective risk tolerance and objective system reliability. This research provides project managers with a dynamic 3D visualization of space, time, and workforce utilization and interaction in uncertain environments, further facilitating reliable project scheduling decision-making.

1 November 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
Gongfan ChenGongfan Chen
Gongfan Chen
Min LiuMin Liu
Min Liu
HLHuaming Li
Huaming Li
SHSimon M. Hsiang
Simon M. Hsiang
AJAshtad Jarvamard
Ashtad Jarvamard

1 July 2022 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
CHChuanni He
Chuanni He
Min LiuMin Liu
Min Liu
YZYuXiang Zhang
YuXiang Zhang
ZWZhigao Wang
Zhigao Wang
SHSimon M. Hsiang
Simon M. Hsiang
CJChen Jiang
Chen Jiang
The COVID pandemic has given rise to the necessity of social distancing regulations, which has brought the importance of workspace management on the construction site to an unprecedented level. Understanding and visualizing the interaction and tradeoff among space, time, and workforce is critical for construction managers to schedule and deliver projects on time. Therefore, the objectives of this research are to investigate how the critical path method (CPM) and Takt-time planning methods utilize space, time, and workforce differently, develop a tool to visualize the space–time–workforce interactions, and investigate the space–time–workforce tradeoff based on different managers’ preferences. This research selected a high-rise office building project and collected 889 sets of productivity data of five specialty trades. The research built a simulation model to investigate productivity and project performance under 267 scenarios of different combinations of the three resources. A dynamic tool was then developed to visualize workspace, time, and workforce interactions. Finally, a Choquet integral–based evaluation and decision tool was developed. The simulation results show that the Takt-time planning method can reduce up to 80% of workspace overlap compared with the actual production plan with less than 20% of duration extension. The contributions to the body of knowledge are (1) creating a visual framework for managers to understand the interaction and tradeoff among space, time, and workforce quickly and accurately, and (2) developing an innovative Choquet integral approach for managers to evaluate planning strategies according to project preferences. The framework and analysis method can be adapted to other construction projects to assist managers to visualize and optimize the space–time–workforce tradeoff under uncertain project drivers.

1 March 2023 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
Gongfan ChenGongfan Chen
Gongfan Chen
HLHuaming Li
Huaming Li
MLMin Liu
Min Liu
SHSimon M. Hsiang
Simon M. Hsiang
AJAshtad Jarvamardi
Ashtad Jarvamardi
This research aims to develop an automatic incentive–penalty enforcement system for modular construction. Smart contract rules were developed for a project of 120 prefabricated bath units. The results show that the smart contract can automatically enforce rewards and penalties for all 19 scenarios. The findings can help project managers detect and reject any inappropriate or malicious operations deviated from predefined rules efficiently. The results show that if the prefabricated bathroom unit fabricator can perform at the highest reliability level following the smart contract rules, the project can save 4.7% overall cost compared with the benchmark scenario. The findings will be beneficial to modular construction project by ensuring efficient monitoring, motivating reliable performance, and improving productivity and project documentation.

13 October 2024 in Sensors
Verified
Journal Article
Open access
PDF file
Gongfan ChenGongfan Chen
Gongfan Chen
Abdullah AlsharefAbdullah Alsharef
Abdullah Alsharef
EJEdward Jaselskis
Edward Jaselskis
Image classification is increasingly being utilized on construction sites to automate project monitoring, driven by advancements in reality-capture technologies and artificial intelligence (AI). Deploying real-time applications remains a challenge due to the limited computing resources available on-site, particularly on remote construction sites that have limited telecommunication support or access due to high signal attenuation within a structure. To address this issue, this research proposes an efficient edge-computing-enabled image classification framework for support of real-time construction AI applications. A lightweight binary image classifier was developed using MobileNet transfer learning, followed by a quantization process to reduce model size while maintaining accuracy. A complete edge computing hardware module, including components like Raspberry Pi, Edge TPU, and battery, was assembled, and a multimodal software module (incorporating visual, textual, and audio data) was integrated into the edge computing environment to enable an intelligent image classification system. Two practical case studies involving material classification and safety detection were deployed to demonstrate the effectiveness of the proposed framework. The results demonstrated the developed prototype successfully synchronized multimodal mechanisms and achieved zero latency in differentiating materials and identifying hazardous nails without any internet connectivity. Construction managers can leverage the developed prototype to facilitate centralized management efforts without compromising accuracy or extra investment in computing resources. This research paves the way for edge “intelligence” to be enabled for future construction job sites and promote real-time human-technology interactions without the need for high-speed internet.