Yu Han

Mr. Yu Han


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2024 in Energies
Verified
Journal Article
Open access
PDF file
YLYang Liu
Yang Liu
FYFuyao Yang
Fuyao Yang
YHYu Han
Yu Han
JGJie Gao
Jie Gao
DCDeZhi Chen
DeZhi Chen
HBHaonan Bai
Haonan Bai
Dual-phase composite magnetic materials have magnetic and permanent magnetic properties. They can realize the dual-phase conversion of soft magnetic and permanent magnetic composites with a small amount of excitation energy. They have the advantages of good control and conversion characteristics and save energy, and they have a wide range of application scenarios in regard to power equipment. In this paper, the magnetization modeling of dual-phase composite magnetic materials is carried out based on micromagnetic theory, and a specific mathematical expression is given. Secondly, the preparation process of the dual-phase composite magnetic material is studied, the dual-phase composite magnetic material is prepared, and the demagnetization curve of the dual-phase composite magnetic material is measured. Finally, the application of dual-phase composite magnetic materials in power equipment is carried out. Using the soft magnetic and permanent magnetic characteristics of dual-phase composite magnetic materials, their impact on DC bias suppression in transformers is assessed. Magnetic circuit reluctance theory is used to develop the structure and electromagnetic design of a transformer. A transformer prototype with DC bias suppression ability based on dual-phase composite magnetic materials is manufactured, and simulation and experimental research are carried out. The simulation and experimental results verify the correctness of the proposed scheme. Although this scheme requires a more complex core structure, the energy-saving effect is remarkable without changing the transformer’s neutral grounding. The indicators meet the actual requirements of the project.