1 February 2018 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
DADENİZ ARTAN
DENİZ ARTAN
GBGokce Bakioglu
Gokce Bakioglu
Construction projects generally involve high risk because they are widely based on estimations of future events. Disputes between the project participants, including contractors and subcontractors, are often related to inaccurate projection and inadequate knowledge of the consequences of the risks involved. The aim of this study is analyzing and modeling the relationship between risk and dispute in subcontractor contracts. By examining 60 subcontractor contracts and related project documents and interviewing contract and project managers who worked on these projects, the risk in each contract has been measured and occurrences of disputes have been quantified. The results show that while disputes in infrastructure works are more related to site supervision and personnel, disputes in superstructure works are more related to project planning/design and management. The correlation analysis performed reveals that regional risks have the highest correlation with the total dispute score, followed by financial risks, design risks, construction risks, and finally subcontractor risks. A regression model to explain the relationship between risk and dispute in subcontractor contracts has also been presented in the study, and statistical tests have been carried out to demonstrate its validity. The results obtained can be used by the parties involved in subcontractor contracts for a more structured risk assessment, a better understanding of potential sources of disputes, and therefore more informed decision making before signing a contract.

17 August 2020 in Arabian Journal for Science and Engineering
Verified
Journal Article
Closed access
PDF file
ITISILAY TEKÇE
ISILAY TEKÇE
EEEsin Ergen
Esin Ergen
DADENİZ ARTAN
DENİZ ARTAN

18 May 2020 in International Journal of Construction Management
Verified
Journal Article
Closed access
KKKadir Kuru
Kadir Kuru
DADENİZ ARTAN
DENİZ ARTAN
Public-private partnership (PPP) is being widely used to meet the growing infrastructure and service demand. However, previous literature draws attention to distressed or failed PPP projects due to significant risks. In the quest for assessing risks and estimating the performance at the outset of a project, there is a need for a practical tool allowing in-depth analysis of the project conditions. This paper aims to develop a PPP Canvas which enables assessment of the project risk factors and determining the related compensation mechanisms that can be used to mitigate these risks or allocate them to the parties in a balanced way. The Canvas also helps to estimate a project performance score based on the significance coefficients determined by the Analytical Hierarchy Process. AHP results show that stability of economic environment, political support and government intervention are the most important risk factors in the local context. AHP can be repeated for each specific PPP project, as part of the PPP Canvas process, to foster discussion and analysis of the risks and compensation mechanisms across different geographical locations and PPP project types. The paper adds a new dimension to PPP risk assessment by making use of the Business Model Canvas approach and the inclusion of contractual compensation and penalty mechanisms. As the stakeholders become more informed of the project conditions and the risks involved, they can make better decisions throughout the project life-cycle and can benefit from the identified compensation mechanisms in contract drafting.

1 January 2021 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
PDF file
EEE. Ergen
E. Ergen
BKB. Kula
B. Kula
GGGursans Guven
Gursans Guven
DADENİZ ARTAN
DENİZ ARTAN
Occupant feedback is not effectively used in the facility management (FM) phase for operations and maintenance activities as well as retrofit and refurbishment investment decisions. One of the reasons is related to incomplete or mostly unstructured occupant feedback data. The goal of this paper is (1) to formalize occupant feedback in office buildings by developing a semantic data model, and (2) to implement the semantic data model in a prototype to demonstrate that capturing and storing occupant feedback and integrating it with building information modeling (BIM) improves the experience of both occupants and FM personnel. Interviews were conducted with office occupants and facility managers, and use cases were created to develop the semantic data model. This data model was implemented in the Industry Foundation Classes (IFC) schema and a case study was conducted, in which a prototype for collecting occupant feedback integrated with BIM was developed to test the proposed approach. The applicability, practicability, and usability of the system were measured via usability tests that were applied to the occupants and FM team members. The findings showed that the proposed semantic data model can be utilized to store occupant feedback in a structured manner and to integrate this information with BIM-enabled FM systems. This approach facilitates (1) continuous collection of occupant feedback along with the vital contextual information including geometric data, and (2) effective utilization of this information in FM operations by providing visualization and analysis capabilities.

23 February 2024 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
DYDincer Inanc Yilmaz
Dincer Inanc Yilmaz
DADENİZ ARTAN
DENİZ ARTAN
Inadequate management of safety risks causes fatalities, injuries, delays, and cost overruns in construction projects. Unpredictable and hostile conditions in coastal construction exacerbate these safety risks. Successful risk management requires effective management and communication of risk information as well as rapid access to relevant knowledge. For this purpose, safety risk management systems were developed using digital technologies, however, none focus on coastal construction, where the activities, risk factors, and mitigation methods are significantly different. This study aims to develop an occupational safety risk management system tailored to the specific needs of coastal construction projects that (1) collects risk data from the site in a structured and continuous manner and (2) facilitates knowledge-based decision-making to support effective risk management utilizing digital technologies. A prototype is developed and use cases are presented to illustrate the main objectives of the prototype and the proposed vision for its integration into building information modeling (BIM). The deployment in two real-world projects demonstrates that the developed prototype is applicable, practical, usable and that real-time risk data can be collected and analyzed with the proposed system. Using the risk information collected by the prototype, which supports proactive and dynamic risk management, managers can make critical decisions about the current project, undertake long-term safety planning, and utilize an organizational learning approach for risk avoidance in future projects.

21 April 2022 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
DADENİZ ARTAN
DENİZ ARTAN
EEEsin Ergen
Esin Ergen
BKBehlul Kula
Behlul Kula
GGGursans Guven
Gursans Guven
The feedback obtained from occupants regarding their comfort needs and performance of buildings is critical for assessing occupant satisfaction, identifying the operation and maintenance (O&M) issues in time and for improving resource efficiency in buildings. Current facility management (FM) systems and occupant feedback collection practices, however, have limitations in supporting effective decision-making in FM, as they lack the necessary contextual data related to the occupant feedback (e.g., building geometry, systems, elements). Building Information Modeling (BIM)-enabled FM systems are used for combining different types of FM information with building models; however, occupant feedback is still not effectively utilized in FM since it is not integrated with BIM. In this study, a BIM integrated post-occupancy evaluation system prototype is developed for: (1) collecting occupant feedback along with the contextual information related to the feedback items in a structured way, and (2) presenting this information as integrated with BIM to the facility managers. This enables conducting spatio-temporal queries and supports effective decision-making by visualizing the collected feedback. The prototype was designed by using qualitative shadowing with FM teams to identify information needs and use case analysis to determine how contextual data integrated with BIM could be collected from office occupants who are non-technical persons with limited information on building models. This paper identifies the FM query categories that are required to process the occupant feedback and describes the RateWorkSpace prototype developed for office buildings. The deployment of the prototype in a real-world office demonstrates that the proposed system is applicable, practical, usable, and that real-time building performance data can be both collected and analysed with the developed system. This has the potential to increase the effectiveness of the FM and O&M processes, and help to create office spaces with optimized energy use and occupant comfort that also supports occupant well-being and productivity.