The track smoothness of high-speed railroads is severely limited to ensure train performance. The concrete continuous girder bridge is deformed to influence the smoothness of the bridge decks and track caused by creep bulge. There is a need to research the impact of beam creep on the dynamical response of bridge and train operation safety. This paper used Midas software to calculate the long-term deformation of large-span prestressed concrete continuous beam bridges under concrete creep and shrinkage. The train-bridge coupled system was established by adopting self-programming software. Thereafter, the large-term deformation results of the main girder are considered as track irregularity input into the vibration equation of the train-bridge system. The safety of the train operation was evaluated by calculating the dynamic response of the bridge and analyzing the criteria of train running safety. It was shown that the indicators of the large-span bridge are within the allowable code values under all working conditions. The bridge deformation under creep has an impact on the displacement and acceleration response of the bridge when a high-speed train passes through. There is no noticeable impact of creep deformation on the operational performance of trains. Nevertheless, the criteria for assessing the safety of trains’ operation, such as derailment factor, wheel load differences, lateral wheel forces, and vehicle acceleration, have been increased.
Elevated stations are integral components of urban rail transit systems, significantly impacting passengers’ travel experience and the operational efficiency of the transportation system. However, current elevated station designs often do not sufficiently consider the structural dynamic response under various operating conditions. This oversight can limit the operational efficiency of the stations and pose potential safety hazards. Addressing this issue, this study establishes a vehicle-bridge-station spatial coupling vibration simulation model utilizing the self-developed software GSAP V1.0, focusing on integrated station-bridge and combined station-bridge elevated station designs. The simulation results are meticulously compared with field data to ensure the fidelity of the model. Analyzing the dynamic response of the station in relation to train parameters reveals significant insights. Notably, under similar travel conditions, integrated stations exhibit lower vertical acceleration in the rail-bearing layer compared to combined stations, while the vertical acceleration patterns at the platform and hall layers demonstrate contrasting behaviors. At lower speeds, the vertical acceleration at the station concourse level is comparable for both station types, yet integrated stations exhibit notably higher platform-level acceleration. Conversely, under high-speed conditions, integrated stations show increased vertical acceleration at the platform and hall levels compared to combined stations, particularly under unloaded double-line working conditions, indicating a superior dynamic performance of combined stations in complex operational scenarios. However, challenges such as increased station height due to bridge box girder maintenance, track layer waterproofing, and track girder support maintenance exist for combined stations, warranting comprehensive evaluation for station selection. Further analysis of integrated station-bridge structures reveals that adjustments in the floor slab thickness at the rail-bearing and platform levels significantly reduce dynamic responses, whereas increasing the rail beam height notably diminishes displacement responses. Conversely, alterations in the waiting hall floor slab thickness and frame column cross-sections exhibit a minimal impact on the station dynamics. Overall, optimizing structural dimensions can effectively mitigate dynamic responses, offering valuable insights for station design and operation.
Elevated stations serve as critical hubs in urban rail transit engineering. The structure of multi-line “building-bridge integrated” elevated stations is unique, with intricate force transfer paths and challenges to clarify dynamic coupling from train vibrations, necessitating the study of such stations’ train-induced dynamic responses. This paper presents a case study of a typical “building-bridge integrated” elevated station, utilizing the self-developed finite element software GSAP-V2024 to establish a simulation model of a coupled train–track–station system. It analyzed the station’s dynamic response under various single-track operating conditions and the pattern of the vibration response as the speed changes. Additionally, the study examined lateral vibration response changes in the station under double, quadruple, and sextuple train operations at the same speed. Findings reveal that the station’s vertical responses generally increase with speed, significantly outpacing lateral responses. Under single-track operations, dynamic responses vary across different types of track-bearing floors and frame structures with different spans. With an increase in the number of operating train lines, the station’s vertical response grows, with lateral responses being neutralized in the mid-span of the triple-span frame structure and amplified at the edges. These results provide a reference for the structural design of multi-line “building-bridge integrated” elevated stations.
With the continuous development of maglev transportation technology, medium–low-speed maglev trains have been widely implemented in many countries. However, due to the limitations of existing specifications, the stiffness limit values of the large-span main girders used in medium–low-speed maglev trains have not been unified. To address this issue, this study takes a specific bridge on a dedicated maglev line as an example and uses self-developed software to model the vehicle–bridge dynamic system. The natural vibration characteristics and vehicle–bridge coupling vibration response of the bridge are calculated and analyzed. Based on this, the influence of pier top stiffness on the dynamic characteristics of a typical medium–low-speed maglev train–bridge system under different working conditions is investigated, with a focus on the lateral line stiffness at the pier top. The results show that vehicle speed has no significant effect on the lateral displacement of the main girder, the lateral displacement of the pier top, the lateral acceleration of the pier top, and the transverse and longitudinal angles of the beam end, and no obvious regularity is observed. However, in the double-track operating condition, the vertical deflection of the main girder is significantly higher than that in the single-track operating condition. As the lateral linear stiffness at the pier top increases, the fundamental frequency of the bridge’s lateral bending vibration gradually increases, while the fundamental frequency of longitudinal floating gradually decreases. The lateral displacements, including those of the main girder, pier top, and beam ends, all decrease, whereas the lateral and vertical vibration accelerations of the main girder and the train are less affected by the lateral stiffness at the pier top.
With the integrated development of high-speed railways and urban underground rail transit, large high-speed railway station buildings are often seamlessly connected or even co-constructed with subway structures, forming a complex structural system that integrates high-speed rail, subway, and station buildings. To investigate the dynamic performance of such “ integrated station-bridge” station buildings constructed with subways, this paper takes Yichang North Station as an engineering case study and examines its vertical dynamic characteristics under multi-source train-induced loads. The station adopts a structural configuration where the station tracks are fully integrated with the station building, while the main lines are separated from it. To accurately simulate the entire process of train operation, this study established a refined “train-track-station” spatially coupled dynamics model that incorporates high-speed and subway trains, tracks, and the station structure. Based on this model, various operational scenarios were systematically analyzed, including high-speed trains passing at different speeds, parallel operation of multiple train lines, and combined operation of high-speed and subway trains. The results demonstrate that, when single or multiple high-speed train lines pass through the station at the design entry speed of 80 km/h, the vertical vibration acceleration of the elevated waiting level meets human comfort standards. The train-induced vibration response is transmitted and superimposed along the “column–beam–slab” path, resulting in localized acceleration peaks at the mid-span regions of beams and slabs directly above the tracks. Second, the impact of subway train operation alone on the vibration of the elevated level is significantly weaker than that of high-speed trains. Furthermore, under combined high-speed and subway train operations, the additional vibration contribution from subway trains shows a decreasing trend as the number of simultaneously operating high-speed train lines increases. The findings of this study validate the effectiveness of the structural design of Yichang North Station in terms of train operational safety and passenger waiting comfort. The revealed patterns of multi-source vibration transmission and superposition can provide important theoretical and numerical references for the dynamic optimization design and vibration control of similar integrated transportation hub structures.
The prevalence of “building-bridge integrated” structures in station design is increasing. However, in stations where the mainline speed exceeds 160 km/h, structural joints are typically incorporated to ensure the integrity and functionality of the integrated system. The inspection and maintenance of these joints, which are critical for the long-term performance of such structures, can be particularly complex. Therefore, it is important to explore the feasibility of designing such stations without structural joints on the mainline. To address this issue, two six-line railway bridge-type stations are selected. The vibration simulation analysis model of the train-track-station coupling system is established, considering two structural types of the “building-bridge integrated” system: the arrival-departure line “building-bridge integrated” and the mainline “building-bridge integrated”. The vibration responses induced by trains passing through two types of “building-bridge integrated” station structures at speeds of 200~350 km/h on the mainline and 80 km/h on the arrival and departure tracks were simulated. The six-line operating conditions were selected as an example, and the influence of setting a structural joint on the mainline on the dynamic response of the “building-bridge integrated” station structure was analyzed. For both types of “building-bridge integrated” station structures, with and without a structural joint on the mainline, the dynamic responses of trains under operational loads show minimal differences. However, the structural joints on the mainline reduce the overall stiffness of the rail bearing floor slab and effectively isolate the train-induced responses transmitted to the platform slab during high-speed operation on the mainline. Therefore, the acceleration response of the platform slab is smaller in station structures with structural joints, while the acceleration and displacement response of the rail bearing floor slab is larger. Additionally, structural joints often lead to issues such as water leakage and seepage. Considering these factors, it is advisable to avoid setting structural joints on the mainline for such station structures.