Xianglong Li

Dr. Xianglong Li


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 April 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
JBJiayu Bao
Jiayu Bao
XLXianglong Li
Xianglong Li
TYTao Yu
Tao Yu
Liangliang JiangLiangliang Jiang
Liangliang Jiang
JZJialin Zhang
Jialin Zhang
WXWenqiang Xu
Wenqiang Xu
To achieve the goals of carbon peak and carbon neutrality, Xinjiang, as an autonomous region in China with large energy reserves, should adjust its energy development and vigorously develop new energy sources, such as photovoltaic (PV) power. This study utilized data spatiotemporal variation in solar radiation from 1984 to 2016 to verify that Xinjiang is suitable for the development of PV power generation. Then, the averages of the solar radiation, sunshine duration, and other data in the period after 2000 were used to assess the suitability of Xinjiang, based on spatial principal component analysis (SPCA). Finally, the theoretical power generation potential, fossil fuel reduction, and CO2 emissions reduction were estimated. The results are as follows: (1) In terms of temporal variation, the solar radiation in Xinjiang decreased (1984–2002), increased (2002–2009), and decreased again (2009–2016), but the fluctuations were not statistically significant. In terms of spatial distribution, the Kunlun Mountains in southern Xinjiang had the highest solar radiation during the span of the study period. Hami and Turpan, in eastern Xinjiang, had sufficiently high and stable solar radiation. (2) The area in Xinjiang classed as highly suitable for solar PV power generation is about 87,837 km2, which is mainly concentrated in eastern Xinjiang. (3) In the situation where the construction of PV power plants in Xinjiang is fully developed, the theoretical potential of annual solar PV power generation in Xinjiang is approximately 8.57 × 106 GWh. This is equivalent to 2.59 × 109 tce of coal. Furthermore, 6.58 × 109 t of CO2 emissions can be reduced. PV power generation potential is approximately 27 times the energy consumption of Xinjiang in 2020. Through the suitability assessment and calculations, we found that Xinjiang has significant potential for PV systems.

4 October 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
PZPinzhe Zhao
Pinzhe Zhao
XLXianglong Li
Xianglong Li
QHQiwen Hu¹
Qiwen Hu¹
MDMili Du
Mili Du
Cut blasting in deep excavations occurs in rock masses subject to unequal initial stresses. This study compares two SPH–FEM simulations of the same cut-blasting problem: S35–22, a prescribed biaxial initial-stress state derived from mine-provided field stress records, with horizontal and vertical components of 35 and 22 MPa, respectively, and S0, a zero-preload numerical baseline. The analysis considers equivalent-stress histories and sectional RHT damage over 0–20 ms, the cumulative initial mass of rock SPH particles first observed at D = 1 and its interval-average increase over 0–40 ms, and finite-window cumulative first-crossing mass evaluated through 40 ms. The comparison characterizes the response of the prescribed S35–22 state relative to S0 within the stated observation windows.