Thibaud Monteiro

Prof. Dr. Thibaud Monteiro

orcid

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2018 in Transportation Research Part C: Emerging Technologies
Verified
Journal Article
Closed access
OTOscar Tellez
Oscar Tellez
SVSamuel Vercraene
Samuel Vercraene
FLFabien Lehuédé
Fabien Lehuédé
OPOlivier Péton
Olivier Péton
TMThibaud Monteiro
Thibaud Monteiro

1 October 2017 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
MMMourad Makaci
Mourad Makaci
PRPaul Reaidy
Paul Reaidy
KEKarine Evrard-Samuel
Karine Evrard-Samuel
VBValérie Botta-Genoulaz
Valérie Botta-Genoulaz
TMThibaud Monteiro
Thibaud Monteiro

1 June 2009 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
STSimon Tamayo
Simon Tamayo
TMThibaud Monteiro
Thibaud Monteiro
NSNathalie Sauer
Nathalie Sauer

25 June 2015 in International Journal of Production Research
Verified
Journal Article
Closed access
TMThibaud Monteiro
Thibaud Monteiro
NMNadine Meskens
Nadine Meskens
TWTao Wang
Tao Wang
International audienceDaily operating theatre scheduling is a complex problem with strong constraints and various objectives to optimise. In this article, we aim not only to optimise the classical objectives of scheduling performance, such as the makespan and the cost of overtime, but also, particularly, to upgrade human resource management performance by means of two additional objectives: a short-term objective on the quality of teamwork and a long-term objective on the level of nurses’ skills. The quality of teamwork depends on affinities between team members, which also have a significant impact on the quality and the safety of surgery. It maintains the unity of surgical teams. Such unity is however unfavourable to nurses’ skill diversification. In order to counterbalance this tendency, the long-term objective proposed is for nurses to acquire the widest possible spectrum of skills, in order to be able to assist surgeons in unplanned and emergency surgery. Taking into account these two antagonistic human resources objectives contributes to patient safety through better team building. It is the main originality of this work. In the long term, this method reduces the impact of this antagonism. In addition, we use the multi-objective ε-constraint method to obtain Pareto optimal solutions

1 May 2007 in Computers in Industry
Verified
Journal Article
Closed access
TMThibaud Monteiro
Thibaud Monteiro
DRDaniel Roy
Daniel Roy
DADidier Anciaux
Didier Anciaux

1 March 2018 in Health Care Management Science
Verified
Journal Article
Closed access
PDF file
LCLinjie Chen
Linjie Chen
TMThibaud Monteiro
Thibaud Monteiro
TWTao Wang
Tao Wang
EMEric Marcon
Eric Marcon