Yue Gan

Ms. Yue Gan


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
YCYuxiang Cheng
Yuxiang Cheng
YGYue Gan
Yue Gan
CSChunmei Shi
Chunmei Shi
Aidi HuoAidi Huo
Aidi Huo
YPYinghui Pei
Yinghui Pei
Adnan AhmedAdnan Ahmed
Adnan Ahmed
Geological hazards are widely distributed, cause huge losses, and have always been the focus of attention for engineering and environmental geologists. Geological hazard evaluation is the basis of research and has important theoretical significance for preventing and controlling geological hazards. Therefore, geological hazard evaluation has become the focus of engineering and environmental geology. The question of how to build a universal index system model of geological hazard evaluation is an urgent problem that needs to be solved in geological hazard evaluation. Based on a large amount of previous research data, this paper takes landslide hazard as an example and systematically expounds the main problems that need to be solved in the current geological hazard evaluation from five aspects: basic concept, evaluation scope and accuracy, evaluation index system and evaluation criteria, evaluation method, and applicability of evaluation results. A landslide hazard assessment index system model is proposed, which applies to all regions, including all of the factors that may affect the formation of landslides. It is also hoped that this will be used as an example to establish various types of disaster evaluation and assessment systems. If the parameter has no value in the assessment process, it can be processed as 0. On this basis, further research is suggested from the perspectives of the geological hazard evaluation level, geological hazard evaluation theory, and method. To provide thoughts on and suggestions for geological hazard risk assessment method research, standard revision, investigation and evaluation, and risk management and control need to be considered.