Cheng Zeng

Dr. Cheng Zeng

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2017 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
CZCheng Zeng
Cheng Zeng
SLShuli Liu
Shuli Liu
ASAshish Shukla
Ashish Shukla

1 June 2017 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
CZCheng Zeng
Cheng Zeng
SLShuli Liu
Shuli Liu
ASAshish Shukla
Ashish Shukla

1 May 2020 in Renewable Energy
Verified
Journal Article
Open access
Xiaojing HanXiaojing Han
Xiaojing Han
SLShuli Liu
Shuli Liu
CZCheng Zeng
Cheng Zeng
Liu YangLiu Yang
Liu Yang
ASAshish Shukla
Ashish Shukla
YSYongliang Shen
Yongliang Shen

3 July 2023 in Applied Energy
Verified
Journal Article
Open access
XMXiaoli Ma
Xiaoli Ma
CZCheng Zeng
Cheng Zeng
ZZZishang Zhu
Zishang Zhu
Xudong ZhaoXudong Zhao
Xudong Zhao
Xin XiaoXin Xiao
Xin Xiao
SSSamson Shittu
Samson Shittu

1 November 2019 in Applied Thermal Engineering
Verified
Journal Article
Closed access
CZCheng Zeng
Cheng Zeng
SLShuli Liu
Shuli Liu
LYLiu Yang
Liu Yang
XHXiaojing Han
Xiaojing Han
MSMing Song
Ming Song
ASAshish Shukla
Ashish Shukla

16 January 2025 in Building Services Engineering Research & Technology
Verified
Journal Article
Closed access
ZWZhichu Wang
Zhichu Wang
CZCheng Zeng
Cheng Zeng
ZZZishang Zhu
Zishang Zhu
YLYunhai Li
Yunhai Li
XMXiaoli Ma
Xiaoli Ma
XZXudong Zhao
Xudong Zhao
As data centres become integral to modern infrastructure, their energy consumption, particularly in cooling systems, presents a critical challenge for sustainability. This paper addresses this issue by applying time-series machine learning models to forecast the performance of a highly efficient 100 kW evaporative cooling system applied in a real-world data centre. Using a dataset spanning 4 months, we developed and optimised two predictive models based on XGBoost and Random Forest, to estimate cooling capacity and Coefficient of Performance (COP). Initial results showed suboptimal performance, with the XGBoost model achieving a Mean Absolute Error (MAE) of 1.34 for cooling capacity and 6.50 for COP, alongside a negative R-squared, indicating poor fit. However, after hyperparameter tuning, the Random Forest model significantly improved the predictions, achieving an MAE of 0.39 and an R-squared of 0.85 for cooling capacity, and an MAE of 2.21 and an R-squared of 0.54 for COP. These findings underscore the potential of these models to optimise cooling efficiency, offering valuable insights for reducing energy consumption and operational costs in data centre operations. This research paves the way for more sustainable data centre designs and operations across diverse climatic conditions. Practical application: The predictive models developed in this study enable building environment professionals to optimise data centre cooling systems. By accurately forecasting cooling capacity and Coefficient of Performance (COP) under varying environmental conditions, these models allow for proactive adjustments to cooling strategies, ensuring efficient operation and minimising energy waste. This research provides a practical tool for enhancing the sustainability of data centres, directly supporting industry efforts to meet stringent energy efficiency targets and reduce the carbon footprint of critical infrastructure.