Zengwu Liu

Zengwu Liu


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2025 in Coatings
Verified
Journal Article
Open access
PDF file
ZLZengwu Liu
Zengwu Liu
MYMin Yao
Min Yao
QWQiuya Wang
Qiuya Wang
YRYunhao Ren
Yunhao Ren
In view of the fact that the specification does not specify the calculation model for the temperature gradient of the concrete box-shaped arch rib without wing plates, and there is also a lack of relevant research on the temperature model of this type of arch rib, this paper carries out research on the impact of sunshine temperature on a section of concrete box arch rib without a flange plate based on the 355 m Shuiluohe Bridge. Firstly, a temperature experiment of the arch rib without flange plates was conducted. According to the experimental data, the temperature distribution and changing rules of the arch rib cross-section were analyzed. Then, according to the measured temperature data, a calculation mode of the vertical temperature gradient of the arch rib was proposed and compared with the specification. Finally, in view of the most disadvantageous phases of the arch rib in the construction process, the influence of different gradient modes on the structural mechanical behavior was analyzed by means of a simulation model. The results show that along the span from the springing to L/2, the maximal temperatures of the top plate, web plate and bottom plate gradually increase. The temperature gradient of the box’s top plate is the largest, that of the web plate is the second largest, and that of the bottom plate is the smallest. The vertical temperature difference of the key section of the arch rib gradually increases from the springing to L/2, and the maximal temperature difference of the section at L/2 is 16.3 °C, which is 4.2 °C higher than that of the springing section. The vertical temperature gradient proposed in this paper is a four-fold nonlinear model. Compared with the temperature gradient distribution range specified in the specification, the vertical temperature gradient in this article has a wider distribution range in the cross-section height, and the temperature varies more quickly along the cross-section height. The temperature gradient model proposed has more adverse effects on the mechanical behavior of the structure. The temperature gradient model proposed in this paper not only fills the gap in the specification but also provides suggestions for the design and construction of bridges. Meanwhile, the temperature distribution model of this type of arch rib also lays a theoretical foundation for the further development of corresponding thermal insulation materials for concrete surfaces or new concrete materials.

26 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
ZLZengwu Liu
Zengwu Liu
SLShuai Luo
Shuai Luo
MJMenglin Jiang
Menglin Jiang
While building the steel–concrete composite girder bridge by means of the incremental launching method, the steel box is directly in the sunlight, and the temperature impact should not be neglected. However, the existing specifications fail to offer the temperature gradient pattern applicable to the steel box featuring a significant height–width ratio and straight web. This paper, relying on the Fenshui River Bridge situated in the southwest region of China, carried out a temperature test. By analyzing the experimental data, the rules of temperature changes at the measuring points in various positions of the steel box were studied, and the temperature disparities of the steel box across different seasons were contrasted. Through the analysis of the test data, the rule governing temperature distribution across the height dimension of the cross-section and its change with time were studied, and a model designed to represent the temperature gradient within the steel box was put forward. By utilizing the numerical model, the effect of the temperature gradient on the force acting on the structure in the process of incremental launching was analyzed. The findings indicate that the temperature of the top plate of the steel box is the highest from 14:00 to 16:00. There is a lag phenomenon in the temperature rise in the bottom plate. The greatest temperature disparity between the upper and lower plates of the steel box is not always present in the season when the temperature is comparatively high. The curve of temperature gradient change exhibits nonlinear features, and the variation in temperature is considerable within the scope of 1 m. In this article, a double-broken line temperature gradient model is put forward, with the corresponding temperature gradient of 17.8 °C. The temperature gradient obviously affects the structural stress, changing the stress distribution, and it notably impacts the deformation. The deformation generated on the guide beam due to the temperature gradient makes up 39% of the total deformation. The temperature gradient is not a fixed value. When the steel box girder is under the jacking process, especially while the structure remains in its maximum cantilever condition and is about to cross the pier, the time should be avoided when the temperature gradient is at its highest.

15 July 2025 in Materials
Verified
Journal Article
Open access
PDF file
RWRisheng Wang
Risheng Wang
HWHongrui Wu
Hongrui Wu
ZLZengwu Liu
Zengwu Liu
HWHanyu Wang
Hanyu Wang
YZYongzhuang Zhang
Yongzhuang Zhang
This study focuses on the development of high-performance composite cementitious materials for offshore engineering applications, addressing the critical challenges of durability, environmental degradation, and carbon emissions. By incorporating polycarboxylate superplasticizers (PCE) and combining fly ash (FA), ground granulated blast furnace slag (GGBS), and silica fume (SF) in various proportions, composite mortars were designed and evaluated. A series of laboratory tests were conducted to assess workability, mechanical properties, volume stability, and durability under simulated marine conditions. The results demonstrate that the optimized composite exhibits superior performance in terms of strength development, shrinkage control, and resistance to chloride penetration and freeze–thaw cycles. Microstructural analysis further reveals that the enhanced performance is attributed to the formation of additional calcium silicate hydrate (C–S–H) gel and a denser internal matrix resulting from secondary hydration. These findings suggest that the proposed material holds significant potential for enhancing the long-term durability and sustainability of marine infrastructure.

9 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
QWQiuya Wang
Qiuya Wang
CWChunyu Wang
Chunyu Wang
QDQinxi DONG
Qinxi DONG
鹍赵鹍鹏 赵
鹍鹏 赵
ZLZengwu Liu
Zengwu Liu
RCRuixue Chen
Ruixue Chen
Aiming at the problems of main cable geometry calculation and control accuracy in construction for long-span asymmetric suspension bridges, this paper proposes a practical method for main cable geometry calculation of asymmetric suspension bridges based on the Rushankou Bridge. Firstly, a hanger–pylon–girder model was established to obtain the constraint force at the hanger top. Then, with the mid-span sag of the main cable set as the control target, the coordinates and unstressed length of the main cable in the completed bridge state were obtained based on the pylon–cable model. Finally, the final main cable geometry and unstressed length were obtained based on the main cable–hanger–pylon–girder model. The reliability of the method in this paper was validated by engineering monitoring data. Using the simulation model, the influence laws and degrees of parameters including temperature, main cable elastic modulus, main cable weight, hanger force and main girder weight on the main cable geometry were investigated. It is indicated that the method in this paper is capable of accurately calculating the main cable shape of asymmetric suspension bridges. After the installation of cable clamps and hangers, the theoretical and measured deformations of the main cable are in good agreement. The theoretical and measured values at the mid-span L/2 of the main span are −233.9 cm and −234.7 cm, respectively, with a deviation of 8 mm. The largest discrepancy between the calculated and actual deformations of the main cable is located at 7L/8 of the main span, which is merely 2.2 cm. The deformation of the main cable is greatly affected by temperature changes; each 1 °C temperature variation leads to a mid-span deformation of about 2.4 cm in the main cable. If the influence of temperature variation on main cable geometry is ignored during construction, it will cause errors in the main cable elevation after installation. The effect of the main cable elastic modulus on its deformation cannot be neglected, and a 10% variation in the main cable elastic modulus leads to a 58 cm change in the main cable geometry.