The implementation of a circular economy (CE) in the construction sector faces several challenges that hinder its progress. Research on the awareness, key enablers, and potential benefits of CE in Saudi Arabia’s construction of mega-projects that could contribute and promote a successful transition is still at its early stages and remains limited. This study delves into CE awareness and understanding, identifying the key enablers that could support its successful adoption in Saudi Arabian mega-projects and the potential benefits associated with it. To achieve this, a comprehensive literature review was conducted, followed by 18 semi-structured interviews across three case studies, which involved the main stakeholders in building, urban development, and infrastructure projects. The findings, which are thematically analysed, revealed that CE awareness mostly focuses on reuse, recycle, and waste reduction. A significant gap in the knowledge of circularity throughout projects’ lifecycles has been identified. As such, this study concludes that the key enablers for CE include establishing regulatory frameworks, enhancing professionals’ awareness and education, promoting the use of advanced technology, ensuring a mature market, and supporting CE initiatives. Moreover, the potential environmental and socio-economic benefits of CE, such as cost reduction, environmental impact reduction, and better-improved quality of life are crucial for encouraging a wider implementation of CE in the construction of mega-projects in Saudi Arabia.
The construction sector has been subjected to scrutiny due to its propensity for waste generation and the extensive utilisation of finite natural resources. In response to these concerns, a transition towards a novel conceptual framework known as circular economy (CE) has been advocated. Nevertheless, the integration of CE principles within the construction domain encounters numerous impediments to its advancement. Despite scholarly recognition of these challenges, scant research has been devoted to elucidating the intricacies associated with the planning and execution of large-scale projects, particularly within developing nations such as the Kingdom of Saudi Arabia (KSA). This paper intends to fill this gap through the identification and ranking of those barriers encountered when trying to implement CE during construction in KSA. To this end, a comprehensive literature review was completed, alongside a survey conducted amongst 239 participants involved in three mega-projects. A statistical analysis of the data collected was carried out based on the one-way analysis of variance (ANOVA). Following this, a relative importance index (RII) was established to rank 24 barriers categorised as major within the sample. The findings revealed the lack of regulation within the construction sector, the lack of education and training, little awareness and guidance on the subject, and the absence of an incentives policy as primary barriers to adopting CE in KSA. The present study endeavours to enhance the comprehension regarding the principles of circular economy (CE) and the attendant challenges encountered during its implementation. The overarching objective is to provide insights that can inform decision-making processes, thereby facilitating the development of robust mitigation strategies and the adoption of best practices.
The consistent growth of the construction sector during the last decades has generated massive waste that severely impacts the environment. Globally, construction activities generate around 30% of the overall waste annually, and the numbers are expected to increase due to population growth projections and the need for infrastructure developments. As a matter of fact, the causes of waste can be grouped into seven categories namely, design-related, procurement-related, human-related, handling and storage, site conditions, management-related, and due to other external factors, such as the effect of weather and accidents. In addition, construction waste types are influenced by project type, size, and construction method. To mitigate the impacts of construction waste, a plethora of practices have been recommended, including innovations for procurement, design, and construction. The present study scrutinises potential opportunities for minimising construction waste and proposes future sustainability enhancement related to construction activities. A pivotal contribution of this study is the creation of a matrix that links the identified causes of construction waste with sustainability practices, offering a comprehensive insight for effectively reducing waste and enhancing the sustainability of construction activities.
Circular economy continues to gain momentum in the field of construction. Notwithstanding the rapid attention this concept is gathering within the construction industry, a clear framework to facilitate its implementation in Saudi Arabia has yet to be developed. This paper aims to tackle this knowledge gap by proposing a framework for CE implementation in construction mega-projects. This study builds upon past research by the authors, where 12 key CE enablers for the construction of mega-projects were identified. Interpretive Structural Modelling (ISM) has been brought into the current research to collect and analyse the relevant data, including further validation of the enablers conducted with two university professors and six participants actively involved in three mega-projects. Following this, 17 professionals (stakeholders) drawn from separate case studies were selected to examine the contextual relationships between the identified enablers. In a third and last stage, the framework underwent additional validation by three professionals and three academics to ensure its consistency and adaptability for the Saudi Arabian construction industry. The results obtained showed that all CE enablers clustered into four categories: dependent, driving, linkage, and autonomous, whereas the ISM analysis demonstrated that CE in construction mega-projects fits a five-level framework, starting with the establishment of law and legislation. The integrated framework not only fills the identified knowledge gaps but also serves as a tool for the strategic implementation of CE in Saudi Arabia’s mega-projects.
The construction industry continues to generate vast volumes of waste, which harm the environment and negatively impact socio-economic sustainability, especially in a developing country like Saudi Arabia. Prior to investigating effective approaches for managing waste, we must identify the main drivers of construction waste. This paper develops metrics and criteria for identifying and ranking the waste cause factors (WCFs) in the construction of mega-projects in Saudi Arabia. The methodology adopted includes a thorough literature review and a survey ranking waste factors based on a five-point Likert-scale. Data collected from 239 participants across three distinct construction mega-projects were analysed using one-way analysis of variance (ANOVA) with its corresponding post hoc tests, and the identified waste factors were ranked according to their relative importance index (RII). The findings of this study indicate that the main sources of waste in Saudi Arabia involve design changes and complexity, poor project coordination, inefficient waste management systems, lack of supervision, drawing errors, low skill levels among workers and designers, and procurement mistakes. The results and discussions derived from the investigation aim to deepen the understanding of the causes of waste in large-scale construction, which could inform researchers, policymakers, and professionals, whose joint contributions should enable effective waste management strategies in large construction projects.