Fu Dao

Mr. Fu Dao

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 March 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KSKe-Bin Shi
Ke-Bin Shi
RSRenyi SHI
Renyi SHI
FDFu Dao
Fu Dao
ZLZhipeng Lu
Zhipeng Lu
JZJianming Zhang
Jianming Zhang
In order to solve the problem of the poor adaptability of the TBM digging process to changes in geological conditions, a new TBM digging model is proposed. An ensemble learning prediction model based on XGBoost, combined with Optuna for hyperparameter optimization, enables the real-time identification of surrounding rock grades. Firstly, an original dataset was established based on the TBM tunneling parameters under different surrounding rock grades based on the KS tunnel. Subsequently, the RF–RFECV was employed for feature selection and six features were selected as the optimal feature subset according to the importance measure of random forest features and used to construct the XGBoost identification model. Furthermore, the Optuna framework was utilized to optimize the hyperparameters of XGBoost and validated by applying the established TBM dataset of the KS Tunnel. In order to verify the applicability and efficiency of the proposed model in surrounding rock grade identification, the prediction results of five commonly used machine learning models, Optuna–XGBoost, Random Forest (RF), Gradient Boosting Decision Tree (GBDT), Decision Tree (DT), XGBoost, and PSO–XGBoost, were compared and analyzed. The main conclusions are as follows: the feature selection method based on RF–RFECV improved the accuracy by 8.26%. Among the optimal feature subset, T was the most essential feature for the model’s input, while PR was the least important. The Optuna–XGBoost model proposed in this paper had higher accuracy (0.9833), precision (0.9803), recall (0.9813), and F1 score (0.9807) than other models and could be used as an effective means for the lithological identification of surrounding rock grade.

6 July 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
FDFu Dao
Fu Dao
KSKe-Bin Shi
Ke-Bin Shi
RSRenyi SHI
Renyi SHI
ZLZhipeng Lu
Zhipeng Lu
JZJianming Zhang
Jianming Zhang
In order to effectively address the potential hazards associated with the construction of Phase II of the YE Water Supply Project’s KS tunnel in Xinjiang, this study employs the WBS-RBS (Work Breakdown Structure and Risk Breakdown Structure) method for risk identification. This approach aims to identify various risks that may arise during TBM (Tunnel Boring Machine) construction. To prevent incomplete risk factor identification resulting from subjective judgment, a risk index system is established based on the identification results. Subsequently, a matter-element extension model is utilized to quantify the risk factors within this index system, and comprehensive weights are determined using variable weight theory to assess construction risk levels. Importance analysis of each index is then conducted to identify those with significant impact on risk evaluation outcomes. Finally, by comparing actual engineering cases with other risk evaluation models, this paper verifies the reliability of its constructed risk assessment model and proposes measures for controlling potential risks based on these evaluations. The paper provides a clear definition of safety risks encountered during TBM construction and conducts comprehensive risk assessments as a valuable reference for research related to the tunnel boring machine construction period in tunnel engineering.