Mohammad Isnaini

Dr. Mohammad Isnaini

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 May 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ARAugustina Asih Rumanti
Augustina Asih Rumanti
ARAfrin Fauzya Rizana
Afrin Fauzya Rizana
LSLutfia Septiningrum
Lutfia Septiningrum
RRRocky Reynaldo
Rocky Reynaldo
MIMohammad Isnaini
Mohammad Isnaini
The current business environment requires every organization or company to achieve optimal performance and maintain it. Innovation capability and open innovation practices play a critical role in improving organizational performance. However, their role in improving Small and Medium Enterprises (SMEs)’s performance, especially during the COVID-19 pandemic, still needs to be identified further. Thus, this study conducts empirical research elaborating intrinsic factors of innovation capability, as well as the influence of open innovation on organizational efforts, i.e., how SMEs achieve optimal performance during the COVID-19 pandemic. In this research model, 206 respondents were gathered and given a reearch questionnaire. The respondents are the owner of batik SMEs located in several regions in Indonesia. PLS-SEM is used to test the data, and the result of this study shows that all hypotheses developed in this study are accepted, i.e., SMEs’ innovation capability and open innovation practices significantly influence financial and operational performance. The results show that in batik SMEs, the ability to innovate and open innovation, especially open entry innovation, can facilitate greater organizational performance. Therefore, batik SMEs woud benefit from initiatives and opportunities that improve their abilities in open innovation.

21 September 2023
Verified
Book Chapter
Closed access
PDF file
TATatinia A. R. Amalia
Tatinia A. R. Amalia
MIMohammad Isnaini
Mohammad Isnaini
DIDradjad Irianto
Dradjad Irianto

19 January 2026 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
RYRinto Yusriski
Rinto Yusriski
ANAndri Rachmat Kumalasian Nasution
Andri Rachmat Kumalasian Nasution
MIMohammad Isnaini
Mohammad Isnaini
AHAbdul Hakim Halim
Abdul Hakim Halim
Findings: The proposed algorithm achieves an average efficiency of 99.32% compared to the enumeration algorithm, with minimal deviation (0.4%). The results validate the main proposition for efficient scheduling, including prioritizing jobs based on due dates, allocating job demands based on machine capacity, and sequencing batches based on size to minimize delays.Research limitations/implications: The model assumes static machine conditions and predefined job parameters, limiting its applicability in dynamic environments. Future research can extend this approach to incorporate real-time job arrivals or machine breakdown scenarios.Practical implications: This algorithm provides a practical tool for industries to optimize batch scheduling on unrelated parallel machines, improving production efficiency and reducing operational costs.Social implications: By improving production scheduling, this model indirectly supports sustainable manufacturing practices through optimal resource utilization.Originality/value: This study introduces a novel integration of backward scheduling with resource constraints and sequence-dependent setup times, addressing gaps in scheduling research for unrelated parallel machines.


13 May 2024 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
DKDwi Kurniawan
Dwi Kurniawan
RYRinto Yusriski
Rinto Yusriski
MIMohammad Isnaini
Mohammad Isnaini
AMAnas Ma'Ruf
Anas Ma'Ruf
AHAbdul Hakim Halim
Abdul Hakim Halim
Purpose: This paper investigates a batch scheduling problem where pre-processing is required for parts before processing, considering time-changing effects from part deterioration and operator learning-forgetting.Design/methodology/approach: A mathematical model was developed with the decision variables of the number of batches, the number of pre-processings, batch sizes, and the schedule of processes and pre-processings to minimize total actual flow time. Different numbers of batches were gradually tried and increased until the objective function stopped improving. The minimum number of pre-processings that resulted in a feasible solution was examined at each number of batches.Findings: Our experiment showed that: (1) A faster operator learning led to a lower optimal number of batches and a lower total actual flow time, (2) A faster part deterioration brought a higher number of batches and a higher total actual flow time, (3) The model minimized the number of pre-processings by only scheduling pre-processings before the operations at machine 1, and (4) The model divided the parts into small batches to prevent increased processing time due to part deterioration.Research limitations: The research did not consider multi-due date and multi-item system which require pre-processings with different times and capacities.Practical implications: Production managers should assign fast learning operators to shorter batches and faster deteriorating parts.Originality/value: This research was the first to consider pre-processing in batch scheduling.