Florian Hammer

Dr. Florian Hammer


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
SBSarah Barber
Sarah Barber
LLLuiz Andre Moyses Lima
Luiz Andre Moyses Lima
YSYoshiaki Sakagami
Yoshiaki Sakagami
JQJulian Quick
Julian Quick
ELEffi Latiffianti
Effi Latiffianti
FHFlorian Hammer
Florian Hammer
In the next decade, further digitalisation of the entire wind energy project lifecycle is expected to be a major driver for reducing project costs and risks. In this paper, a literature review on the challenges related to implementation of digitalisation in the wind energy industry is first carried out, showing that there is a strong need for new solutions that enable co-innovation within and between organisations. Therefore, a new collaboration method based on a digital ecosystem is developed and demonstrated. The method is centred around specific “challenges”, which are defined by “challenge providers” within a topical “space” and made available to participants via a digital platform. The data required in order to solve a particular “challenge” are provided by the “challenge providers” under the confidentiality conditions they specify. The method is demonstrated via a case study, the EDP Wind Turbine Fault Detection Challenge. Six submitted solutions using diverse approaches are evaluated. Two of the solutions perform significantly better than EDP’s existing solution in terms of Total Prediction Costs (saving up to €120,000). The digital ecosystem is found to be a promising solution for enabling co-innovation in wind energy in general, providing a number of tangible benefits for both challenge and solution providers.

1 March 2022 in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B. Mechanical Engineering
Verified
Journal Article
Closed access
PDF file
SBSarah Barber
Sarah Barber
FHFlorian Hammer
Florian Hammer
ATAdrian Tica
Adrian Tica
Data-driven wind turbine performance predictions, such as power and loads, are important for planning and operation. Current methods do not take site-specific conditions such as turbulence intensity and shear into account, which could result in errors of up to 10%. In this work, four different machine learning models (k-nearest neighbors regression, random forest regression, extreme gradient boosting regression and artificial neural networks (ANN)) are trained and tested, first on a simulation dataset and then on a real dataset. It is found that machine learning methods that take site-specific conditions into account can improve prediction accuracy by a factor of two to three, depending on the error indicator chosen. Similar results are observed for multi-output ANNs for simulated in- and out-of-plane rotor blade tip deflection and root loads. Future work focuses on understanding transferability of results between different turbines within a wind farm and between different wind turbine types.

10 May 2022 in Preprints.org
Verified
Preprint
Open access
PDF file
SBSarah Barber
Sarah Barber
LLLuiz Lima
Luiz Lima
YSYoshiaki Sakagami
Yoshiaki Sakagami
JQJulian Quick
Julian Quick
ELEffi Latiffianti
Effi Latiffianti
FHFlorian Hammer
Florian Hammer
In the next decade, further digitalisation of the entire wind energy project lifecycle is expected to be a major driver for reducing project costs and risks. In this paper, a literature review on the challenges related to implementation of digitalisation in the wind energy industry is first carried out, showing that there is a strong need for new solutions that enable co-innovation within and between organisations. Therefore, a new collaboration method called the WeDoWind Ecosystem is developed and demonstrated. The method is centred around specific "challenges", which are defined by "challenge providers" within a topical "space" and made available to participants via a digital platform. The data required in order to solve a particular "challenge" is provided by the "challenge providers" under the confidentiality conditions they specify. The method is demonstrated via a case study, the EDP Wind Turbine Fault Detection Challenge. Six submitted solutions using diverse approaches are evaluated. Two of the methods perform significantly better than EDP’s existing method in terms of Total Prediction Costs (saving up to €120,000). The WeDoWind Ecosystem is found to be a promising solution for enabling co-innovation in wind energy, providing a number of tangible benefits for both challenge and solution providers.

9 January 2023 in EGUsphere
Verified
Preprint
Open access
PDF file
FHFlorian Hammer
Florian Hammer
SBSarah Barber
Sarah Barber
SRSebastian Remmler
Sebastian Remmler
FBFederico Bernardoni
Federico Bernardoni
KVKartik Venkatraman
Kartik Venkatraman
KGKnut Erik Giljarhus
Knut Erik Giljarhus
The main goals of a wind resource assessment (WRA) at a given site are to estimate the wind speed and annual energy production (AEP) of the planned wind turbines. Several steps are involved in going from initial wind speed estimations of specific locations to a comprehensive full-scale AEP assessment. These steps differ significantly between the chosen tool and the individuals performing the examination. The goal of this work is to compare different WRA simulation tools at the Perdigão site in Portugal, for which a large amount of wind measurement data is available, in terms of both accuracy and costs. Results from nine different simulations from five different modellers were obtained via the "IEA Wind Task 31 Comparison metrics simulation challenge for wind resource assessment in complex terrain", consisting of a range of linear models, Reynolds-Averaged Navier-Stokes (RANS) computational fluid dynamics models and Large Eddy Simulations (LES). The wind speed and AEP prediction errors for three different met mast positions across the site were investigated and further translated into relative “skill” and “cost” scores, using a method previously developed by the authors. This allowed the most optimal simulation tool in terms of accuracy and cost to be chosen for this site. It was found that the RANS simulations achieved very high prediction accuracy at relatively low costs for both wind speed and AEP estimations. The LES simulations achieved great wind speed prediction for certain conditions, but at a much higher cost, which in turn also reduced the number of possible simulations, leading to a decrease in AEP prediction accuracy. For some of the simulations, the forest canopy was explicitly modelled, which was proven to be beneficial for wind speed predictions at lower heights above the ground, but lead to under-estimations of wind speeds at upper heights, decreasing the AEP prediction accuracy. Lastly, low correlation qualities between wind speed and AEP prediction error were found for each position, showing that accurate wind modelling is not necessarily the only important variable in the WRA process, and that all the steps must be considered.