Shunhua Zhou

Prof. Dr. Shunhua Zhou

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2016 in Engineering Geology
Verified
Journal Article
Closed access
HDHonggui Di
Honggui Di
SZShunhua Zhou
Shunhua Zhou
JXJunhua Xiao
Junhua Xiao
QGQuanmei Gong
Quanmei Gong
ZLZhe Luo
Zhe Luo

1 March 2017 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
SZShunhua Zhou
Shunhua Zhou
XLXue Li
Xue Li
CJChang Ji
Chang Ji
JXJunhua XIAO
Junhua XIAO
The construction of a slurry shield tunnel produces large amount of excavated soil. Direct discharge of the excavated soil by transportation not only increases the overall construction cost but also raises environmental concerns of pollution. In this study, we explore in-situ recycle of excavated soil in the Nanjing Yangtze River tunnel project as the back-fill grout. A series of laboratory were carried out to determine the synchronous grout parameters, including compression strength and shear strength, initial setting time, fluidity, consistency, and bleeding rate. The mixture ratio of the back-fill grout is also discussed to optimize the grout performance. It is found that: (1) the excavated soil produced from the construction of slurry shield tunnel in this project can be reused as the material of back-fill grout in the sand stratum; (2) Proper selection of binder/sand ratio and fly ash/cement ratio improves the performance of the synchronous grout. The test results demonstrated that the discharged soil can be recycled in-situ as the grouting material in the sand stratum.

11 March 2024 in Inverse Problems
Verified
Journal Article
Closed access
ZTZhiyao Tian
Zhiyao Tian
ALAnthony Lee
Anthony Lee
SZShunhua Zhou
Shunhua Zhou
Bayesian curve fitting plays an important role in inverse problems, and is often addressed using the reversible jump Markov chain Monte Carlo (RJMCMC) algorithm. However, this algorithm can be computationally inefficient without appropriately tuned proposals. As a remedy, we present an adaptive RJMCMC algorithm for the curve fitting problems by extending the adaptive Metropolis sampler from a fixed-dimensional to a trans-dimensional case. In this presented algorithm, both the size and orientation of the proposal function can be automatically adjusted in the sampling process. Specifically, the curve fitting setting allows for the approximation of the posterior covariance of the a priori unknown function on a representative grid of points. This approximation facilitates the definition of efficient proposals. In addition, we introduce an auxiliary-tempered version of this algorithm via non-reversible parallel tempering. To evaluate the algorithms, we conduct numerical tests involving a series of controlled experiments. The results demonstrate that the adaptive algorithms exhibit significantly higher efficiency compared to the conventional ones. Even in cases where the posterior distribution is highly complex, leading to ineffective convergence in the auxiliary-tempered conventional RJMCMC, the proposed auxiliary-tempered adaptive RJMCMC performs satisfactorily. Furthermore, we present a realistic inverse example to test the algorithms. The successful application of the adaptive algorithm distinguishes it again from the conventional one that fails to converge effectively even after millions of iterations.

1 October 2016 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
SZShunhua Zhou
Shunhua Zhou
HDHonggui Di
Honggui Di
JXJunhua Xiao
Junhua Xiao
PWPeixin Wang
Peixin Wang
This study investigated the differential settlement and induced structural damage in the west extension of Nanjing Metro Line 1. The minimum and maximum cumulative settlements measured over the course of four years of operation were 1 mm and 122 mm, respectively. Four settlement troughs in the longitudinal direction of the line, as well as a periodic variation of differential settlement between the stations and the tunnel, were observed. Approximately 10% of the vertical radius of curvature of the line violates the safety limit of 15,000 m, and three typical kinds of cracks (i.e., transverse cracks in the tunnel roof and in the track bed, and inclined cracks in the outer wall) and leakage have occurred. The differential settlement of the line was mainly caused by the nonuniform distribution of underlying soft soil. The periodic variation of differential settlement between the stations and tunnel was attributed to the structural characteristics and the seasonal variation in the groundwater level. The findings presented in this paper can provide a reference for controlling the differential settlement of tunnels constructed in soft deposits.

24 June 2021 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
HDHonggui Di
Honggui Di
SZShunhua Zhou
Shunhua Zhou
XYXiping Yao
Xiping Yao
ZTZhiyao Tian
Zhiyao Tian

1 December 2015 in International Journal of Geomechanics
Verified
Journal Article
Closed access
GHGao-Xiao Han
Gao-Xiao Han
QGQuan-Mei Gong
Quan-Mei Gong
SZShunhua Zhou
Shunhua Zhou