SHI Zhe-ming

SHI Zhe-ming


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 May 2024 in Water
Verified
Journal Article
Open access
PDF file
XWXinfeng Wang
Xinfeng Wang
LGLei Gong
Lei Gong
YLYuanqing Liu
Yuanqing Liu
YWYan Wang
Yan Wang
QWQingang Wang
Qingang Wang
SZSHI Zhe-ming
SHI Zhe-ming
The impact of a tunnel construction on the groundwater system depends on various parameters and cannot be easily predicted. Along these lines, a deep understanding of the hydrological relationship between tunnels and surface water is considered of vital importance for ensuring safety during railway construction. Upon completion, the North Taihang Tunnel will be one of four extra-long railway tunnels running through the natural ecotope and level-3 protection areas of the Tianshengqiao National Geological Park in Fuping County, Hebei Province. It will be 1 km away from the Tianshengqiao Nine Falls, which is known as a breathtaking landscape feature in Northern China. Local government, societies, and railway design units have raised concerns about whether the construction and operation of the North Taihang Tunnel will affect the Tianshengqiao Nine Falls. To effectively address this issue, in this work, hydrogeological mapping and hydraulic potential-energy calculations were performed in conjunction with hydrochemical and geological structure analyses. The groundwater system units in the study area were divided and the water source of the nine-level waterfall was determined retrospectively. In addition, the recharge of groundwater to the nine-level waterfall was calculated, the hydrogeological properties of the linear structure were analyzed, and the dominant channels of underwater discharge in surface water were compared and studied. The extracted results indicated that: (1) The Tianshengqiao Nine Falls represent a seasonal fall landscape, which is mainly supplied by surface water formed by precipitation and a low proportion of groundwater supply. (2) The water bodies of the North Taihang Tunnel project and Tianshengqiao Nine Falls belong to two independent groundwater systems. (3) No linear structure that connects these two groundwater systems has yet been discovered. It is widely accepted that a minor possibility of hydraulic connection might be present between the North Taihang Tunnel and Tianshengqiao Nine Falls. This work analyzed the water quantity of Nine Falls, determined the hydraulic relationship between the tunnel project and the waterhead of the Nine Falls, and addressed all stakeholder concerns. The conclusions could provide technological support for the scheduled construction projects.