The “Double High—Double Extra High” stage of offshore oilfields, where large pumps lift liquids, leads to a rapid rise in water concentration, which triggers a decrease in rock strength and exacerbates the risk of sand production; this leads to a blockage of the reservoir, thus restricting the release of production capacity. In this paper, for the typical weak cementation strength of unconsolidated sandstone of a Class I reservoir in the P oilfield, numerical simulation and indoor experimental methods are utilized to explore the plugging mechanism and law of the water-contenting conditions, with micro-sand and mud conditions, on the screen. Considering the combined effects of reservoir particulate transport plugging and near-well sand control media plugging, the additional pressure drop and skin factor calculation model is constructed, and a dynamic capacity prediction model for sand control wells is formed. By matching the physical properties of the target reservoir and optimizing the sand control method, the production capacity prediction model and the sand control optimization design method for the high water-content period of the unconsolidated sandstone reservoir are finally obtained. The results show that the median sand size of well A1 in the P oilfield Class I reservoir is 220 μm, the sand transportation diameter is about 15–20 m, the serious plugging area near the well is distributed in 2–2.5 m, and the predicted loss of production capacity is about 18%. The use of a foam metal screen can significantly reduce the plugging pressure and increase the flow of crude oil, which is 2.2 and 1.2 times higher than that of the precision mesh and pre-filled screen, respectively. These research results can provide technical support and theoretical guidance for the sustained, efficient, and stable production of sand reservoirs in the Bohai Oilfield.
Offshore reservoirs are commonly characterized by complex geology, constrained operations, and high per-well investment. Improving economic performance while maintaining deliverability is therefore a pressing need during field development. By combining multilateral wellbores with staged hydraulic fracturing, complex-structured wells can markedly enhance well–reservoir connectivity; however, for fishbone-type complex-structured wells, published studies still provide limited case-based discussion on how branch-junction loss, completion staging, fracture parameters, and the economic metric jointly affect the final design outcome. In this study, a semi-analytical productivity model for complex-structured fractured wells is developed, accounting for a multi-scale coupling among the reservoir, fractures, and the wellbore. The wellbore and fractures are discretized to quantify the contribution of each completion stage and fracture element to overall productivity. An economic metric with net present value (NPV) as the objective function is then introduced, and a genetic-algorithm-based joint optimization method is established for completion staging parameters and fracture-geometry parameters, enabling an automatic search for the key design variables. The model is validated against water–electric analogy experiments and a field case, demonstrating good predictive accuracy. Case studies show that, with a reasonable parameter configuration, complex-structured fractured wells can significantly increase the cumulative oil production and the NPV under a limited increase in cost; the optimized NPV is improved by approximately 20.2%, illustrating the potential interaction among completion staging, fracture parameters, and the NPV metric under the studied reservoir and economic conditions.