Kun-Ting Chen

Dr. Kun-Ting Chen

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2018 in Engineering Geology
Verified
Journal Article
Closed access
KCKun-Ting Chen
Kun-Ting Chen
JWJian-Hong Wu
Jian-Hong Wu

28 April 2020 in Water
Verified
Journal Article
Open access
PDF file
XGXing-Long Gong
Xing-Long Gong
KCKun-Ting Chen
Kun-Ting Chen
XCXiao-Qing Chen
Xiao-Qing Chen
YYYong You
Yong You
JCJian-Gang Chen
Jian-Gang Chen
JLJie Lang
Jie Lang
On 8 August 2017, an Ms 7.0 earthquake struck Jiuzhaigou Valley, triggering abundant landslides and providing a huge source of material for potential debris flows. After the earthquake debris flows were triggered by heavy rainfall, causing traffic disruption and serious property losses. This study aims to describe the debris flow events in Zechawa Gully, calculate the peak discharges of the debris flows, characterize the debris flow disasters, propose mitigation countermeasures to control these disasters and analyse the effectiveness of countermeasures that were implemented in May 2019. The results showed the following: (1) The frequency of the debris flows in Zechawa Gully with small- and medium-scale will increase due to the influence of the Ms 7.0 Jiuzhaigou earthquake. (2) An accurate debris flow peak discharge can be obtained by comparing the calculated results of four different methods. (3) The failure of a check dam in the channel had an amplification effect on the peak discharge, resulting in a destructive debris flow event on 4 August 2016. Due to the disaster risk posed by dam failure, both blocking and deposit stopping measures should be adopted for debris flow mitigation. (4) Optimized engineering countermeasures with blocking and deposit stopping measures were proposed and implemented in May 2019 based on the debris flow disaster characteristics of Zechawa Gully, and the reconstructed engineering projects were effective in controlling a post-earthquake debris flow disaster on 21 June 2019.

13 March 2014 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
KCKun-Ting Chen
Kun-Ting Chen
YKYu-Shu Kuo
Yu-Shu Kuo
CSChjeng-Lun Shieh
Chjeng-Lun Shieh

23 July 2011 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
YKYu-Shu Kuo
Yu-Shu Kuo
YTYun-Chung Tsang
Yun-Chung Tsang
KCKun-Ting Chen
Kun-Ting Chen
CSChjeng-Lun Shieh
Chjeng-Lun Shieh

23 July 2011 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
YCYu-Shiu Chen
Yu-Shiu Chen
YKYu-Shu Kuo
Yu-Shu Kuo
WLWen-Chi Lai
Wen-Chi Lai
YTYuan-Jung Tsai
Yuan-Jung Tsai
SLShin-Ping Lee
Shin-Ping Lee
CSChjeng-Lun Shieh
Chjeng-Lun Shieh

7 September 2017 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
GHGui-Sheng Hu
Gui-Sheng Hu
NCNing-shen CHEN
Ning-shen CHEN
JTJaved Iqbal Tanoli
Javed Iqbal Tanoli
MLMei Liu
Mei Liu
RLRong-Kun Liu
Rong-Kun Liu
KCKun-Ting Chen
Kun-Ting Chen