Haoran Li

Mr. Haoran Li


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 May 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HLHaoran Li
Haoran Li
FYFei Ye
Fei Ye
XHXingbo Han
Xingbo Han
XHXin Han
Xin Han
As urban underground spaces continue to develop, new engineering projects are increasingly closer to existing operating tunnels. This study focuses on the impact of excavation work, such as a new tunnel or deep excavation, on an existing shield tunnel. However, few studies have examined the simultaneous effects of excavation and over-crossing tunneling on operational tunnels. This paper presents a case study of Section 2 of Hangzhou Metro Line 7, employing MIDAS GTS to simulate the settlement of the existing tunnel and analyze the data collected through automatic measurements. Both methods demonstrated that excavating a foundation pit near the existing tunnel results in the tunnel’s settlement while over-crossing tunneling of the new tunnels leads to the uplift of the existing tunnel. The excavation prompted the existing tunnel to move horizontally toward the foundation pit, whereas over-crossing tunneling pushed it horizontally away. The numerical simulation revealed minor vertical displacement but significant horizontal displacement, aligning closely with the measured data. The impacts of foundation pit excavation and over-crossing tunneling on the vertical and horizontal displacement of existing tunnels are contrary, suggesting that the two construction stages will offset each other.

24 November 2023 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
HLHaoran Li
Haoran Li
FYFei Ye
Fei Ye
ESEnjie Su
Enjie Su
XHXingbo Han
Xingbo Han
With the continuous development of urban underground spaces, new underground engineering approaches are becoming more similar to existing operating tunnels. Existing research is typically concerned with the impact of a single project, such as a new tunnel or deep excavation, on existing shield tunnels. There are few studies on the influence of both excavation and overcrossing tunneling on operational tunnels. Taking a section ranging from the Chengzhan Station to the Jiangcheng Road Station of Hangzhou Metro Line 7 as a case study, this study analyzes the automatic monitoring data of the existing tunnel within this section. Through data analysis, the influences of deep excavation and shield tunneling on the vertical settlement, horizontal displacement, segment convergence, and differential settlement of the tunnel ballast of the adjacent existing line segment are assessed. The influence of deep excavation and overcrossing tunneling on multiple disturbances of existing line tunnels is summarized. This study will be useful for similar projects involving deep excavation next to existing tunnels and overcrossing tunneling, as it will help clarify the protection range of existing lines and determine the displacement alarm value of existing structures.