The Structural Equation Modeling SEM using SmartPLS.V3 software was used in this study to model the priority of CSFs of program management under four categories (program planning, strategy of the organization, stakeholders, and construction program performance) associated with Regional Development Programs RDPs in Iraqi provinces. Based on the literature review, the identified CSFs of program management have been explored through a systematic review approach. This model investigated the relationship and effect of CSFs on program management of regional development. The measurement model underwent three iterations to fulfil the threshold criterion, which included Cronbach's a being more than 0.7, CR being greater than 0.7, and AVE being more significant than 0.5. As a result, the model met the convergent validity. For every path modelling and hypothesis, the structural model is evaluated. The model produced a GoF of (0.524), regarded as sufficiently high to be considered for obtaining adequate global PLS model validity. The model's global GoF performance was also assessed, and the findings met the criteria. It is clear from the final model that there may be a connection between the main program management groups, as shown by the path model confirmed.
23 October 2017 in Arabian Journal for Science and Engineering
The aim of this study is identifying and diagnosing the causes of construction project failure by using different project management process groups. These groups were initiation process group, planning process group, design process group, contract process group, executing and monitoring process group, and close process group. Also, the relative importance of the causes of construction project failure was investigated. Three techniques were used in this study: Ishikawa diagrams, Pareto diagrams, and 5-why techniques. The results were generally identified and diagnosed thirty-five causes of the construction project failure; however, only twenty-three of the causes were the most important. The majority of causes (thirteen causes) were obtained by using executing and monitoring project management process group. Seven causes were obtained by using contract project management process group. In addition, fewer causes (only three causes) were obtained by using initiation project management process group.
30 March 2020 in Scientific Review Engineering and Environmental Sciences (SREES)
Machine Learning Regression Techniques (MLRT) as a shrewd method can be utilized in this study being exceptionally fruitful in demonstrating non-linear and the interrelationships among them in problems of construction projects such as the earned value indexes for tall buildings projects in Republic of Iraq. Three forecasting models were developed to foresee Schedule Performance Index (SPI) as first model, Cost Performance Index (CPI) as a second model, and the third model is To Complete Cost Performance Indicator (TCPI) in Bismayah New City was chosen as a case study. The methodology is mainly impacted by the deciding various components (variables) which impact on the earned value analysis, six free factors (X1: BAC, Budget at Completion; X2: AC, Actual Cost; X3: A%, Actual Percentage; X4: EV, Earned Value; X5: P%, Planning Percentage, and X6: PV, Planning Value) were self-assertively assigned and agreeably depicted for per tall buildings projects. It was found that the MLRT showed good results of estimation in terms of correlation coefficient (R) generated by MLR models for SPI and CPI and TCPI where the R were 85.5%, 89.2%, and 86.3% respectively. At long last, a result tends to be presumed that these models show a brilliant concurrence with the genuine estimations.
This paper aims to diagnostic and assessment the benefits and barriers of Building Information Modelling in the construction project management. Both open and closed questionnaire was used to explore the views of a number of Iraqi engineers; in order to investigate the level of BIM implementation in Iraq construction sector. Questionnaire indicated an acceptable awareness of (BIM) in Iraq, especially among the young generation of engineers which indicates the arrival of the evolutionary stream of BIM in the next few years. Moreover, questionnaire showed that the most important advantage of implementing BIM in the Iraqi construction sector was the ability to generate accurate 2D plans at any stage, while the least important advantage was the ability to provide a careful planning of the site facilities, with a relative importance of (82 %) and (33 %) respectively. Furthermore, the most important barrier to its implementation was the unspecified responsibilities for data content, as presented by questionnaire, while the least important barrier was the lack of programs efficiency in data exchange and internal collaboration, with a relative importance of (81 %) and (34 %) respectively.
Construction projects still face the old–new problem of delivering the projects within the predefined time and cost. This problem becomes more complicated with when addendums and variations are considered during the projects. This study aimed at developing an artificial intelligent model using support vector machine (SVM) technique to predict the time and cost indices of projects. Data from 21 tunnel projects implemented in Kurdistan, Iraq were collected and used in this study. The input data include five variables, namely contract value, contract duration, number of change orders, number of conflicts, and classification of company. WEKA––a set of software for machine learning and data mining––developed at the University of Waikato in New Zealand was used to build SVM model to predict the time and cost indices. The collected data were split by default into a training set of 65%, a testing set of 10% and a validation set of 25%. The results show that SVM model I successfully predicted the cost index not only for the trained data, but also for projects with input parameters out of the range of the training inputs. Mean Absolute Percentage Error (MAPE) and Average Accuracy (AA) for SVM prediction of cost index were found to be 13.9% and 86.1%, respectively. The SVM model II accurately predicted the time index with MAPE and AA of 3.4% and 96.6%, respectively.