Yuehua Jin

Yuehua Jin


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 August 2024 in PLOS ONE
Verified
Journal Article
Open access
PDF file
WZWenbin Zhang
Wenbin Zhang
YJYuehua Jin
Yuehua Jin
RZRonghua Zhang
Ronghua Zhang
YWYiming Wang
Yiming Wang
This paper proposes an optimization scheme for the layout of irregular warehouse spaces based on a class-based storage strategy. Firstly, we transform the irregular warehouse space into several regular rectangular areas. Next, through the class-based storage strategy, we develop an algorithm that converts the non-linear clustering problem of homogeneous shelves into a linear selection problem of different sized regular shelf areas. Finally, a comprehensive shelving clustering algorithm and packing problem with different box sizes selection were constructed, and empirical analysis was conducted based on actual data from Xiangtai Warehouse of State Grid Corporation of China. The results show that the new model not only effectively solves the irregular warehouse layout optimization problem under the class storage strategy but also reduces the complexity of the model and shortens the solution time. It is a universally applicable method with significant value for generalization.

9 April 2025 in PLOS ONE
Verified
Journal Article
Open access
PDF file
WZWenbin Zhang
Wenbin Zhang
YJYuehua Jin
Yuehua Jin
This article proposes a two-stage location model to construct a unified construction plan for multi-construction period material warehouses in the distribution network. Initially, we propose a honeycomb grid partitioning method aimed at managing the time-scale of electric power material demand through effective grid administration. Subsequently, we develop an optimization model for the first stage, which identifies the threshold for the upper limit of material transportation time and establishes the construction objectives for material warehousing during each construction period. To address the challenge posed by the inconsistent locations of material warehouses across different construction periods, we formulate an optimization model for the second stage. Finally, based on the spatial distribution of power demand in Taizhou City’s distribution network, we devise a comprehensive construction plan for a material warehouse system that spans four construction periods. By adding nine material warehouse locations, we achieve a reduction of 57.14% in the maximum transportation time for electric power materials. The method proposed in this article provides a general solution for the long-term planning of persistent structures by converting long-term planning into construction goals across multiple stages.