Guido Micheli

Prof. Guido Micheli

Politecnico di Milano - Department of Management, Economics and Industrial Engineering
orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 August 2012 in International Journal of Physical Distribution & Logistics Management
Verified
Journal Article
Closed access
SPSara Perotti
Sara Perotti
MZMarta Zorzini
Marta Zorzini
Enrico CagnoEnrico Cagno
Enrico Cagno
GMGuido Micheli
Guido Micheli
Purpose: The pressure on logistics companies to embrace green processes has increased significantly in the last few years. Within the broad concept of green supply chain management, a review of the existing literature has highlighted a need to understand how green supply chain practices (GSCP) can contribute to improving company performance from an environmental point of view, as well as economic and operational. This paper aims to investigate the GSCP adopted by third party logistics (3PLs) in Italy in terms of specific practices implemented and level of adoption of each practice, and to explore how this adoption can affect the company performance.Design/methodology/approach: Multi‐case study research involving 15 3PLs operating in Italy, with data collected through face‐to‐face semi‐structured interviews with senior representatives from each company.Findings: Even if findings reveal an overall increasing interest towards environmental issues, the current level of adoption of GSCP is still limited amongst the 3PLs investigated as well as their benefits in terms of company performance. Some players have shown a more proactive attitude and started benefiting substantially from the adoption of GSCP, mainly in terms of environmental and economic performance.Research limitations/implications: The research focuses on 3PLs operating in Italy – findings may differ in other countries and sectors.Practical implications: Findings can be used to support company decisions to either modify the GSCP already in place to achieve a set target or identify the most suitable GSCP to implement.Originality/value: This study contributes to a better understanding of the links between GSCP and company performance. It also provides insights into the GSCP currently in place amongst 3PLs operating in Italy, identifying the type of supply chain to which companies belong (or intend to belong in the future) as a relevant factor.

1 July 2010 in Safety Science
Verified
Journal Article
Closed access
GMGuido Micheli
Guido Micheli
Enrico CagnoEnrico Cagno
Enrico Cagno

1 March 2013 in Safety Science
Verified
Journal Article
Closed access
Enrico CagnoEnrico Cagno
Enrico Cagno
GMGuido Micheli
Guido Micheli
DMDonato Masi
Donato Masi
Celeste JacintoCeleste Jacinto
Celeste Jacinto

1 January 2014 in International Journal of Industrial Ergonomics
Verified
Journal Article
Closed access
Enrico CagnoEnrico Cagno
Enrico Cagno
GMGuido Micheli
Guido Micheli
Celeste JacintoCeleste Jacinto
Celeste Jacinto
DMDonato Masi
Donato Masi

1 February 2011 in Safety Science
Verified
Journal Article
Closed access
Enrico CagnoEnrico Cagno
Enrico Cagno
GMGuido Micheli
Guido Micheli
SPSara Perotti
Sara Perotti

12 September 2008 in Management Research News
Verified
Journal Article
Closed access
PDF file
GMGuido Micheli
Guido Micheli
Enrico CagnoEnrico Cagno
Enrico Cagno
MZMarta Zorzini
Marta Zorzini
Purpose – The purpose of this paper is to understand whether a link between the use of supplier selection (SS) and supply risk management (SRM) exists and whether further contextual factors which lead to the use of SRM and of SS exist in the engineering, procurement and construction (EPC) sector. Design/methodology/approach – A multiple case study has been undertaken as an empirical analysis to answer a series of research questions. The data have been collected through structured interviews to corporate procurement directors of companies belonging to the Italian EPC sector and operating in an engineer-to-order fashion. Findings – The results of the research point out that supply risk can be managed through both SS and SRM. These two different approaches are used alternatively by the companies investigated under resource constraints. A further set of contextual factors leading to the use of SRM (project orientation in supply management, use of partnerships with suppliers, corporate standardisation), and a contextual factor leading to the use of SS (need of co-design) are highlighted in the EPC sector. Research limitations/implications – Although the sample of the in-depth research is representative of the Italian EPC sector, its size implies care in drawing a fully generalizable conclusion. Moreover, the research focuses on companies belonging only to the EPC sector, but the behaviours could significantly vary in other sectors. Originality/value – The paper is of value in identifying product- and supplier-related factors for SRM including cultural (project orientation in supply management), strategic (use of partnerships with suppliers), and organizational (corporate standardisation).