Blagovest Nikolov Zlatev

Dr. Blagovest Nikolov Zlatev

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 August 2024 in Water
Verified
Journal Article
Open access
PDF file
GTGeorgi Todorov
Georgi Todorov
IKIvan Kralov
Ivan Kralov
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
EZEvtim Venets Zahariev
Evtim Venets Zahariev
YSYavor Sofronov
Yavor Sofronov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev
In this paper, analyses of Francis turbine failures for powerful Pumped Hydraulic Energy Storage (PHES) are conducted. The structure is part of PHES Chaira, Bulgaria (HA4—Hydro-Aggregate 4). The aim of the study is to assess the structure-to-concrete embedding to determine the possible causes of damage and destruction of the HA4 Francis spiral casing units. The embedding methods that have been applied in practice for decades are discussed and compared to those used for HA4. A virtual prototype is built based on the finite-element method to clarify the influence of workloads under the generator mode. The stages of the simulation include structural analysis of the spiral casing and concrete under load in generator mode, as well as structural analysis of the spiral casing under loads in generator mode without concrete. Both simulations are of major importance. Since the failure of the surface between the turbine, the spiral casing, and the concrete is observed, the effect of the growing contact gap (no contact) is analyzed. The stresses, strains, and displacements of the turbine units are simulated, followed by an analysis for reliability. The conclusions reveal the possible reasons for cracks and destruction in the main elements of the structure.

14 September 2019
Verified
Book Chapter
Closed access
PDF file
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
MSMario Semkov
Mario Semkov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev

25 November 2024 in Water
Verified
Journal Article
Open access
PDF file
GTGeorgi Todorov
Georgi Todorov
IKIvan Kralov
Ivan Kralov
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
YSYavor Sofronov
Yavor Sofronov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev
EZEvtim Venets Zahariev
Evtim Venets Zahariev
The present study deals with an accident analysis of the “Chaira” Bulgaria high-pressure Pumped Hydroelectric Energy Storage (PHES), especially the failures of the Francis large-scale Hydraulic Unit No. 4 (HU4). The causes of overloading and cracking of the stay vanes and their functionality are investigated. Despite many studies on the behavior of the runner and its safe operation, the complete destruction of the system due to the stay vanes failure has not been sufficiently studied and published in the scientific literature. The aim is to assess the reasons that have led to this unprecedented accident of the “Chaira” PHES of the total destruction of the stay vanes. Based on the historical data and the operating modes, as well as on the identification of the critical elements, an objective assessment of the risks of damage of the stay vanes and of the entire unit is proposed. A virtual prototype is built for the simulation of the system behavior in working and emergency conditions. The loads, stresses, and deformations are precisely calculated. The critical elements of the highly-loaded blocks are evaluated. Low-cycle material fatigue is with a high degree of confidence the dominant reason for the stay vanes complete destruction. The results of the research are used to propose measures for the possible rehabilitation and/or replacement of the unit.

20 June 2024 in Preprints.org
Verified
Preprint
Open access
PDF file
GTGeorgi Todorov
Georgi Todorov
IKIvan Kralov
Ivan Kralov
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
EZEvtim Venets Zahariev
Evtim Venets Zahariev
YSYavor Sofronov
Yavor Sofronov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev
In the paper analyzes of Francis turbine failures for a powerful Pumped Hydraulic Energy Storage (PHES) are conducted. The structure is part of the PHES Chaira, Bulgaria (HA4 - Hydro-Aggregate 4). The aim is assessment of the structure-to-concrete embedment for possible cause of damages and destructions of the HA4 Francis spiral casing units. The embedment methods applied in the practice for decades are discussed and compared to that used for HA4. An innovative virtual prototype is built based on the finite element method to clarify the influence of workloads under generator mode. The stages of the simulation include:- complete structural analysis of the spiral case and the concrete under loads in generator mode;- complete structural analysis of the spiral case under loads in generator mode but without the concrete.Both procedures of simulations (with and without the concrete) are of major importance. Since a failure of the surface between the turbine, the spiral case and the concrete is observed the effect of the increasing contact gap (no contact) is analyzed. The stresses, strains and displacements of the turbine units are simulated followed by important analysis for reliability. The conclusions reveal the possible reasons for cracks and destruction in the main elements of the structure.

16 November 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
GTGeorgi Todorov
Georgi Todorov
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev
The study demonstrates an application of actual technologies and tools for the development of an axial-flux electricity generator. The specifics of its application—a run-of-river sited power station—predefine some of the design parameters that are close to a wind turbine generator. An extensive study of available solutions is used as a starting point for further concept development. The study aims to provide a viable solution for a large-scale electrical machine. A step-based methodology is defined for concept parameters’ assessment and a feasibility study. It demonstrates the advantages of virtual prototyping when assessing various design parameters such as air gaps, coil thickness, and the number of rotor disks. Several simulations over different virtual prototypes provide sufficient information to elaborate an improved design concept. The major result is a ready-for-detailed design concept, with defined major parameters and studied work behavior for a specific, large structure of an electrical machine. Another important result is the presentation of the application of virtual prototyping in the assessment of large structures, for which physical prototyping is an expensive and time-consuming approach. The application of virtual prototyping at a very early product development stage is an effective way to undertake efficient solutions involving the concept of the product.

8 April 2025 in Energies
Verified
Journal Article
Open access
PDF file
GTGeorgi Todorov
Georgi Todorov
IKIvan Kralov
Ivan Kralov
KKKonstantin Hristov Kamberov
Konstantin Hristov Kamberov
YSYavor Sofronov
Yavor Sofronov
BZBlagovest Nikolov Zlatev
Blagovest Nikolov Zlatev
EZEvtim Venets Zahariev
Evtim Venets Zahariev
In the present paper, the subject of investigation is the reliability assessment of the single-stage reversible Hydropower Unit No. 3 (HU3) in the Bulgarian Pumped Hydro-Electric Storage (PHES) plant “Chaira”, which processes the waters of the “Belmeken” dam and “Chaira” dam. Preceding the destruction of HU4 and its virtual simulation, an analysis and its conclusions for rehabilitation and safety provided the information required for the reliability assessment of HU3. Detailed analysis of the consequences of the prolonged use of HU3 was carried out. The Supervisory Control and Data Acquisition (SCADA) system records were studied. Fault Tree Analysis (FTA) was applied to determine the component relationships and subsystem failures that can lead to an undesired primary event. A Failure Modes and Effect Analysis methodology was proposed for the large-scale hydraulic units and PHES. Based on the data of the virtual simulation and the investigations of the HU4 and its damages, as well as on the failures in the stay vanes of HU3, it is recommended to organize the monitoring of crucial elements of the structure and of water ingress into the drainage holes, which will allow for detecting failures in a timely manner.