Ashutosh Tiwari

Mr. Ashutosh Tiwari


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2022 in Advances In Space Research
Verified
Journal Article
Closed access
DMDevara Meghanadh
Devara Meghanadh
VMVipin Kumar Maurya
Vipin Kumar Maurya
ATAshutosh Tiwari
Ashutosh Tiwari
Ramji DwivediRamji Dwivedi
Ramji Dwivedi

1 August 2020 in ISPRS Journal of Photogrammetry and Remote Sensing
Verified
Journal Article
Closed access
ATAshutosh Tiwari
Ashutosh Tiwari
ANAvadh Bihari Narayan
Avadh Bihari Narayan
ODOnkar Dikshit
Onkar Dikshit

23 October 2018 in Geocarto International
Verified
Journal Article
Closed access
ATAshutosh Tiwari
Ashutosh Tiwari
ANAvadh Bihari Narayan
Avadh Bihari Narayan
Ramji DwivediRamji Dwivedi
Ramji Dwivedi
ODOnkar Dikshit
Onkar Dikshit
BNB. Nagarajan
B. Nagarajan
A robust geodetic framework comprising Terrestrial Laser Scanner (TLS), Global Navigation Satellite Systems (GNSS), Robotic Total Station (RTS) and Multi-temporal InSAR (MT-InSAR) was employed first in India to investigate a landslide-prone Sirobagarh region, Uttarakhand at different spatial extents, and to evaluate the relationship amongst the displacement estimates obtained from the applied surveying techniques. TLS derived digital elevation models indicated displacements >5 m on the landslide upper scarp. GNSS and RTS based observations showed horizontal movements towards the Alaknanda river in the landslide slope direction (maximum values: 0.1305 and 0.045 m respectively), and downward vertical motion (largest subsidence magnitude: -2.1315 and -0.030 m respectively). MT-InSAR processing of Sentinel-1a images identified 21071 measurement pixels, highlighting subsidence around the landslide (mean velocity range: -0.110 to 0.008 m/yr). Analysis of displacement vectors using vector equality, cross-covariance, cross-correlation and Principal Component Analysis reveals that GNSS vertical displacement estimates were partially correlated with MT-InSAR measurements (correlated for epoch difference 2-3), whereas there was good cross-correlation between MT-InSAR and LiDAR observations throughout. The displacement estimates and their analyses evident unstable movement of the landslide scarp occurring due to debris flow and rainfall, and a relatively moderate subsidence activity in the surrounding areas lying in the landslide zone.

12 December 2023 in International Journal of Applied Earth Observation and Geoinformation
Verified
Journal Article
Open access
ATAshutosh Tiwari
Ashutosh Tiwari
MSManoochehr Shirzaei
Manoochehr Shirzaei

16 October 2018 in Survey Review
Verified
Journal Article
Closed access
ATAshutosh Tiwari
Ashutosh Tiwari
ANAvadh Bihari Narayan
Avadh Bihari Narayan
RDRamji Dwivedi
Ramji Dwivedi
ASAshutosh Swadeshi
Ashutosh Swadeshi
SPSumanta Pasari
Sumanta Pasari
ODOnkar Dikshit
Onkar Dikshit
This study presents a geodetic deformation monitoring approach and its application on two severely affected and uninvestigated study sites in India, namely the Bhurkunda coal mines in Jharkhand, and the Sirobagarh landslide in Rudraprayag, Uttarakhand. For the Bhurkunda site (characterized by underground coal mining related subsidence), a network of 56 GNSS points, densified by Total Station (TS) ground points, was set up during three field visits. GNSS derived deformation estimates reveal that the southern part of the investigated area underwent subsidence (maximum displacement 1.813 m). Furthermore, DEM differences of the three epochs generated using TS points detect a subsidence of 1.358±0.057 m with similar pattern and magnitude of movement as detected by GNSS stations. For the Sirobagarh landslide (witnessing recurring slides due to local geological conditions and rainfall), a GNSS network of six control points in an area of 500×600 m2 was established. Deformation estimates from GNSS show subsidence in the area with a horizontal trend of movement towards the Alaknanda river situated below the landslide (maximum horizontal and vertical displacement values are 0.1306 m and 2.1315 m respectively). Further, for the Sirobagarh landslide, multi-temporal interferometry using Sentinel-1 SAR images detect displacement vectors showing downward movement of the landslide, with displacement rates ranging from 0.008 to −0.115 m yr−1. It is evident that the landslide scarp encountered high magnitude subsidence, whereas the area containing and surrounding the landslide (~30 km2) underwent a moderate rate of subsidence. A set of surveying guidelines for monitoring deformation events of similar kind are discussed.

1 May 2016
Verified
Conference Paper
Closed access
ATAshutosh Tiwari
Ashutosh Tiwari
VAVenkataramana Ajjarapu
Venkataramana Ajjarapu
This paper is the first of a two-part paper presenting issues related to short term voltage stability problem and then providing possible solution options that can ensure the security of the system. Lately power system planners are frequently encountering voltage problems in short term. Placement of dynamic VAR device in the system is one preferred option. However, there is little research done in the field of dynamic VAR allocation to ensure short term voltage stability and no industry grade tool exists. Part I explores the challenges faced while solving dynamic VAR allocation problem. The problem is complex as it requires proper selection of dynamic model; and consideration of contingencies and system dynamics in the optimization problem which leads to large problem size. Hence, this paper explores different solution methodologies; and finally proposes a novel approach to solve the optimization problem. Part II of this paper provides numerical results that demonstrate the application of the proposed approach.