The Jing-Mi Diversion Canal is a large-scale water diversion project in Beijing. Routine monitoring is crucial for the reliability and stability of urban water supply. Compared with traditional monitoring methods, interferometric synthetic aperture radar (InSAR) has the advantages of large scale and high accuracy. Based on the small baseline subset InSAR, 187 ascending and 102 descending SAR images obtained from Sentinel-1 were used to detect the deformation along the diversion canal from 2017 to 2023. The results show that there was a sinking trend along the diversion canal. The subsidence was serious in the first half of the canal, and continued to sink from 2019 to 2020. The subsidence was alleviated in 2023. Combined with leveling measurements, the InSAR deformation monitoring results of important pumping station buildings were verified. The measurement accuracy of InSAR can reach the millimeter level. We extracted the groundwater level time series and subsidence for risky canal segments. Through pixel-by-pixel comparison, it was found that fluctuations in groundwater level would have some impact on surface deformation. Severe local subsidence or uplift deformation occasionally occurred. To ensure the safety of water diversion, the monitoring and maintenance of relevant pump station buildings in risky areas should be increased in the future.
Complex water conveyance systems often involve mixed flow conditions comprising pressurized pipe networks and free-surface open channels. Every single model has its limitations in long-distance and complex water transfer projects; coupling different models can leverage their respective advantages. For this reason, this study proposes an integrated modeling framework that couples the Storm Water Management Model (SWMM) and Environmental Protection Agency Network Evaluation Tool (EPANET) models to simulate water quality in pressurized–unpressurized coupled systems. Taking the typical Yin Chao Ji Liao water diversion project as a case study, total nitrogen (TN) and total dissolved solids (TDS) were selected as representative pollutants. A total of 32 simulation scenarios were systematically evaluated across four concentration levels at four distinct monitoring points. During this synthesis, key emergency response indicators, specifically T0 (optimal gate-opening time) and T2 (drainage operation duration), were quantified. The results indicate that pollutant dispersion in the unpressurised tunnel section is primarily governed by pollutant loading, whereas in the pressurised pipeline section, it is controlled by flow velocity and pressure differentials. High-concentration pollution in the tunnel section allows for a relatively longer emergency response time (T0 = 453 min). In contrast, due to rapid transport in the pipeline section, emergency operations must be completed swiftly (≤30 min). This coupled approach effectively addresses the challenge of water quality simulation in cross-regime conveyance systems. Future research will focus on integrating real-time sensor monitoring data with this coupled model to further optimize automated early warning protocols for long-distance diversion projects.
1 June 2021 in IOP Conference Series: Earth and Environmental Science
During the construction period, the super-high arch dam is poured monolithically, and the temperature stress level is high. The key to ensure the overall safety of the dam is to do a good job of temperature control and crack prevention during the construction period, and the formulation and optimization of temperature drop curve during the construction period is an important prerequisite for ensuring the temperature control. In addition to the conventional indexes such as the maximum temperature, temperature gradient, cooling range, cooling rate and final combined stress, the transverse joint aperture of the dam should be taken into consideration for the determination of temperature drop curve during dam construction. In this paper, Baihetan super-high arch dam project was taken as an example to study this problem, and the influence of different maximum temperature, target temperature and different cooling process on dam temperature stress, safety factor and transverse joint aperture was systematically analyzed. The results showed that different cooling processes and the setting of stage target temperature have obvious effects on the temperature stress, transverse joint aperture and safety factor during dam construction, and the coupling relation between these factors should be considered comprehensively in formulating the ideal cooling curve, so as to realize the optimization of the overall safety risk of the dam.