Ali Gharbi

Dr. Ali Gharbi

orcid

Research Focus & Metrics

Academic Career Length

30Years (1997-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2016 in Omega
Verified
Journal Article
Open access
BBB. Bouslah
B. Bouslah
AGAli Gharbi
Ali Gharbi
RPR. Pellerin
R. Pellerin

1 April 2021 in Journal of Cleaner Production
Verified
Journal Article
Closed access
AEArezou Entezaminia
Arezou Entezaminia
AGAli Gharbi
Ali Gharbi
MOMustapha Ouhimmou
Mustapha Ouhimmou

1 March 2016 in International Journal of Production Economics
Verified
Journal Article
Open access
BBB. Bouslah
B. Bouslah
AGAli Gharbi
Ali Gharbi
RPR. Pellerin
R. Pellerin

25 July 2013 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
HRHéctor Rivera-Gómez
Héctor Rivera-Gómez
AGAli Gharbi
Ali Gharbi
JKJean-Pierre Kenne
Jean-Pierre Kenne

1 July 2021 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
HRHéctor Rivera-Gómez
Héctor Rivera-Gómez
AGAli Gharbi
Ali Gharbi
JKJean-Pierre Kenné
Jean-Pierre Kenné
RORuth Ortiz-Zarco
Ruth Ortiz-Zarco
JCJosé Ramón Corona-Armenta
José Ramón Corona-Armenta

3 August 2014 in International Journal of Production Research
Verified
Journal Article
Closed access
MAM. Assid
M. Assid
AGAli Gharbi
Ali Gharbi
AHA. Hajji
A. Hajji
This article addresses the problem of joint optimisation of production, setup and maintenance activities of unreliable manufacturing system producing two products. Given the complexity of the problem in a dynamic and stochastic environment, the literature has treated the problem separately by considering each axis individually (setup, production and maintenance) or by combining two axes simultaneously (production-setup, production-maintenance). Following the trend of scientific research advances that supports the fact that an integrated control leads to best performances, the main objective of this paper is to provide a control policy that will simultaneously combine the production, the setup and the preventive maintenance activities. To tackle the problem, an experimental resolution approach using combined continuous/discrete event simulation models is considered. The aim is to accurately imitate the production system behaviour, and to optimise the control policy parameters which minimise the total cost incurred. An in-depth study of the effects of the system parameter variation on the performance of the studied policies is performed in order to draw meaningful conclusions and to illustrate the robustness of the proposed resolution approach.