Kunto Ismoyo

Mr. Kunto Ismoyo


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 June 2025 in Environmental Monitoring and Assessment
Verified
Journal Article
Closed access
PDF file
MHMuhammad Iqbal Habibie
Muhammad Iqbal Habibie
HAHariyanto
Hariyanto
RARobby Arifandri
Robby Arifandri
ZQZulfa Qonita
Zulfa Qonita
PKPronika Kricella
Pronika Kricella
KIKunto Ismoyo
Kunto Ismoyo

1 June 2023 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
DPD A Purnomo
D A Purnomo
DUD P Upahita
D P Upahita
DUD P Utomo
D P Utomo
AWA B Waseso
A B Waseso
TFT Fiantika
T Fiantika
AJAjidarmo
Ajidarmo
The study on public mass transportation in Batam City was started in 2010 by BP Batam. The study is still in a long polemic due to problems arise in technical and non-technical aspects, such as limited funding capacity of local government. Therefore, the government wants to involve private sectors in the development plan. This study aims to analyse the selection of Public Private Partnership (PPP) scheme using value for money (VfM) as one of the solutions for public transportation funding problems. The methodology used in this study is the benchmarking method from several scenarios with an emphasis on the point of view of economic and financial feasibility studies. Several scenarios of PPP Scheme with different concession period and investment proportion were analyzed based on its VfM policy. The result of the VfM analysis shows that the VfM value for actual condition is 1,139,946 (IDR Mill). The most significant factors that affect the value of VfM is the changes in the concession period. The concession period of 20 years gives the maximum VfM value. In all scenarios, there is no negative VfM value which indicates that this public project is better if it is carried out with the PPP scheme.