Abdullrahman A. Al-Shamma’a

Abdullrahman A. Al-Shamma’a


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 March 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Hassan M. Hussein FarhHassan M. Hussein Farh
Hassan M. Hussein Farh
AAAbdullrahman A. Al-Shamma’a
Abdullrahman A. Al-Shamma’a
AQAffaq Qamar
Affaq Qamar
FSFahman Saeed
Fahman Saeed
AAAbdullah Al-Shaalan
Abdullah Al-Shaalan
Line outage contingencies in power distribution systems pose critical challenges, leading to disruptions, reduced reliability, and potential cascading failures. These problems include increased vulnerability, limited resilience, and the need for efficient mitigation strategies to enhance the overall system reliability and quality. This study aims to investigate, analyze, and evaluate the renewable distributed generator (RDG) allocation and sizing under N-1 line outage conditions in terms of the reliability and quality for the IEEE 30-bus benchmark power system as a case study. Under all possible N-1 line outage conditions, there were four critical N-1 line outage conditions, 19–20, 10–20, 27–29, and 27–30, which caused overloading on at least one line. The Severity Performance Index (SPI) recorded the highest value of 0.715 during the line 10–20 outage, followed by 0.683, 0.606, and 0.476 during the line F27–30 outage, line F19–20 outage, and line F27–29 outage, respectively. This indicates that the line 10–20 outage is the most critical among the line outages followed by the line 27–30 outage. During the line 10–20 outage, the crow search integrated with the particle swarm optimizer recommends allocating renewable distributed generators (RDGs) at optimal or feasible buses 14, 15, 17, 20, and 30, with suggested sizes of 26.8127 MW, 38.8986 MW, 27.9600 MW, 21.6300 MW, and 27.0184 MW, respectively. The obtained finding revealed that allocating five RDGs at optimal busbars helped keep the line loading below maximum limits and improved the voltage profiles during the N-1 line outages in the IEEE 30-bus benchmark power system. This approach enhanced the power system reliability and quality across all four N-1 scenarios.

24 September 2024 in Electronics
Verified
Journal Article
Open access
PDF file
FAFahad Alaql
Fahad Alaql
WAWalied Alfraidi
Walied Alfraidi
AAAbdullah Alhatlani
Abdullah Alhatlani
AAAbdullrahman A. Al-Shamma’a
Abdullrahman A. Al-Shamma’a
Hassan M. Hussein FarhHassan M. Hussein Farh
Hassan M. Hussein Farh
AAAhmed Allehyani
Ahmed Allehyani
In this paper, a complete analysis of an LLC resonant converter with a customized rectifier structure is presented. The converter is intended for wide, low-input, high-output voltage DC bus applications. The performance of the converter is assessed using comprehensive time-domain and fundamental harmonic approximation (FHA), which demonstrates its capacity to operate across an ample range of voltages by precisely adjusting the rectifier structure. The converter’s capability is illustrated by deriving and discussing detailed mode operation, steady-state analysis, and DC gain equations. In order to verify the theoretical analysis, a prototype with a power output of 250 watts is constructed and subjected to testing. The results of the testing demonstrate that the converter is both feasible and effective. The experimental findings illustrate its capacity to manage vast voltage ranges while upholding high efficiency. In addition, the converter utilizes a frequency switching modulation (FSM) to connect with a photovoltaic (PV) panel and control the high output voltage. This demonstrates its adaptability in renewable energy applications. The validation is in accordance with theoretical predictions, demonstrating the converter’s high-efficiency performance and versatility.