A quality management process plays a vital role in the success of engineering and construction projects. The management process needs to be effective and efficient if projects are to be completed on time and within the project’s budget. Many construction projects’ quality management processes are paper-based, which makes them time-consuming and inefficient. The next generation of Building Information Modeling (BIM) is the BIM-cloud. The BIM-cloud can help to enhance the effectiveness of a quality management process; it can also save an organization time and money. This paper proposes a quality management model based on cloud computing, mobile devices, and the Autodesk BIM 360 Field software. This software functions as a platform for gathering, managing and controlling the quality of the management data. The process is then applied to a real project in Vietnam to verify the benefits and barriers of using the BIM 360 Field for a construction project.
31 December 2020 in The Journal of Asian Finance, Economics and Business
In the current market of integration and globalization, the competition between engineering and construction companies is increasing. Construction contractors can improve their competitiveness by evaluating and selecting qualified personnel for the construction engineering manager position for their company’s civil engineering projects. However, most personnel evaluation and selection models in the construction industry rely on qualitative techniques, which leads to unsuitable decisions. To overcome this problem, this paper presents evaluation criteria and proposes a new model for selecting construction managers based on the evaluation based on the distance from the average solution approach (EDASA). The research results showed that EDASA has many strengths, such as solving the problem faster when the number of evaluation criteria or the number of alternatives is increased.
1 January 2022 in Journal of Process Management and New Technologies
Project performance is assessed using various criteria. Quality is one of the typical triangle criteria used to assess the performance of any office building project. However, office projects in Vietnam have faced numerous quality risks, particularly during their construction periods. This can cause the building projects to be delayed and over budget. As a result, identifying quality risk factors throughout the construction phase of office projects is essential. Therefore, this paper applies the analytical hierarchy process to prioritize critical risk factors affecting project quality during the construction phase of the Biconsi Tower project in Vietnam. The research results show that the five top risk factors affecting the quality of the Biconsi Tower project from most to least impact are as follows: (1) inspection and approval work are not in accordance with regulations and procedures, (2) lack of coordination between project stakeholders, (3) poor quality design documents and drawings, (4) poor construction methods, and (5) poor quality input materials.