To improve the output characteristics of offshore wind power and to enhance the wind power accommodation, this paper analyzes its output characteristics along the southern coast in China, and then proposes an optimal sizing method of seawater pumped storage plant (SPSP) with variable-speed units in a connected mode on an islanded microgrid. Based on the constraints of variable-speed unit characteristics and power smoothness at the point of common coupling (PCC), the maximum static revenue as the objective function for the optimal sizing of SPSP is established. Notably, under an appropriate smoothness rate at PCC, the constraints that are mentioned above can adequately reflect the advantages of variable-speed units: fast power response and wide operating range. Additionally, they contain more concise models and variables than previously, which are friendly for optimizing the calculations. The results demonstrate that the proposed method is feasible and practical, by simulating and comparing in different scenarios.
Increased attention has been paid to the high-capacity variable-speed pumped storage to stabilize the large-scale renewable energy. Nevertheless, the optimum reference values of variable-speed units (i.e., the optimum speed and optimum gate opening) come from the actual operating data from power plants or the model pump-turbine test from manufacturers. It is generally a commercial secret, and no historical data is available for a new power plant. For general researchers, it is not easy to obtain relevant data. Therefore, this paper proposes an optimization method for the variable-speed unit and establishes a simplified steady-state model that can be used for medium and long-term power system research. First, based on the pump-turbine's performance curves, this paper presents an optimization method for the variable-speed unit in turbine and pump mode without additional tests, aiming to optimize the turbine's efficiency and track the input power of the pump. Second, the concept of “steady operation area in non-optimum condition” is proposed based on the non-linear characteristics of the optimum operating condition curve. Finally, simplified steady-state models of the variable-speed unit are established, and the model validation has been tested in typical scenario analysis. The results show that the variable-speed unit's steady-state operating characteristic can be described by this simplified linear model, based on the power, the head, and the optimum speed (or the gate opening). This simplified model's percentage error is less than 5%, which meets engineering accuracy requirements. The error mainly comes from the linear correlation coefficient of the optimum operating condition curve and the operating head's deviation from the design head. This model is available for power system planning and dispatch.
1 March 2023 in Journal of Renewable and Sustainable Energy
Configuring a certain capacity of energy storage for the power system can effectively improve the reliability of the power supply and the level of wind power consumption. This paper takes pumped storage investment cost and wind power consumption demand as the optimization goal, realizes the coordinated operation of pumped storage units and thermal power units, and considers the uncertainty of wind power and load, the multi-timescale characteristics of different types of units and load demand response, and establishes a multi-timescale pumped storage capacity optimization model based on stochastic programming. The model consists of inner and outer layers. The outer layer is investment decision-making, which decides the allocation of pumped storage capacity. The inner layer is for optimization decision-making, and the system optimization operation is carried out in three stages: day-ahead short-term optimization, intraday ultra short-term optimization, and real-time optimization. An example of a typical scenario is established, and the planning results verify the effectiveness of the proposed model and method. The thermal-wind-hydro power system's total cost decreases first and then increases with the increase in the installed capacity of the pumped storage, and the curtailment rate gradually decreases. The total cost increases faster when the pumped-storage installed capacity is larger than optimal. For a pumped-storage power station of the same capacity, variable-speed pumped storage is better than fixed speed pumped storage in reducing the wind curtailment rate. The main reason is that its output is continuously adjustable under the condition of the variable-speed water pump, which is especially suitable for energy storage at night when wind power is high.
The percentage of penetration in renewable energy generation (REG) in distribution networks has dramatically increased. Variable speed seawater pumped storage, which has a large power controllable range and flexible modes of operation, is an important tool to be applied in distribution networks to realize peak shaving and valley filling, and to mitigate the negative effects of REG. This paper presents a two-stage coordinated optimal scheduling model for the day-ahead and real-time operation of active distribution networks containing seawater pumped storage, REG, and flexible loads. In the model, seawater pumped storage and flexible loads are dispatched in the first day-ahead stage based on short-term forecast information of REG and load demands to minimize total operational costs. Then in the second real-time stage, the operation schedule of seawater pumped storage is adjusted to mitigate the negative effects of forecast errors of REG on the operation of active distribution networks. Network nodes power quality is improved and power loss is reduced. Applying the model, disadvantages of low accuracy short-term forecast are minimized whereas advantages of high accuracy ultra-short term forecast are fully taken. This model is tested using a modified Institute of Electrical and Electronics Engineers 33-bus system. Numerical results demonstrate the effectiveness of the proposed approach.
In micro grid (MG), active/reactive power sharing for all dis-patchable units is an important issue. To meet fluctuating loads’ active and reactive power demands, the units generally adopt primary P-f and Q-U droop control methods. However, at different state of charge (SOC) values, the capability of Lead Acid Battery Bank (LABB) based units to take loads varies in a large range; active power should not be shared according to the units P capacities in a constant ratio. Besides, influenced by the output and line impedance between units, reactive power is not able to be shared in proportion to the units Q capacities. Another problem, after MG power balance requirement is satisfied, frequency and voltage are deviating from their rated values thus power quality is reduced. This paper presents a new smart MG which is based on the multi agent system. To solve the problems mentioned above, P-f and Q-U droop curves are adjusted dynamically and autonomously in local agents. To improve the power quality, secondary restoration function is realized in a decentralized way, the computation tasks are assigned to local, the computation capability and communication reliability requirements for central PC are low, and operation reliability is high. Simulation results back the proposed methods.
In MMC-HVDC-integrated offshore wind farms, the Wind-Farm-side MMC (WFMMC) is increasingly adopting Virtual Synchronous Generator (VSG) control to provide active support. However, this control strategy may introduce high-frequency oscillations that cannot be predicted by conventional stability analysis. Existing suppression strategies, designed for WFMMC under conventional V-f control, fail to account for frequency coupling effects in the high-frequency range, making it difficult to effectively analyze or suppress such oscillations. To address this issue, this article reveals a significant high-frequency-range frequency coupling effect between the wind turbine’s Grid-Side Converter (GSC) and the VSG-controlled MMC, which is distinct from systems with conventional V-f control. It is further identified that the asymmetric control structure introduced by the VSG control and control delay are the key factors driving this coupling. Based on this finding, an oscillation suppression strategy incorporating a band-stop filter in the WFMMC voltage sampling loop is proposed. Time-domain simulations demonstrate the effectiveness of this strategy under various operating conditions.