Filippo Visintin

Prof. Filippo Visintin

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2022 in International Journal of Production Economics
Verified
Journal Article
Closed access
Gianmarco BressanelliGianmarco Bressanelli
Gianmarco Bressanelli
Filippo VisintinFilippo Visintin
Filippo Visintin
nicola Saccaninicola Saccani
nicola Saccani

1 January 2017 in Industrial Marketing Management
Verified
Journal Article
Closed access
SBSaara A. Brax
Saara A. Brax
Filippo VisintinFilippo Visintin
Filippo Visintin

1 March 2014 in International Journal of Production Economics
Verified
Journal Article
Closed access
nicola Saccaninicola Saccani
nicola Saccani
Filippo VisintinFilippo Visintin
Filippo Visintin
MRMario Rapaccini
Mario Rapaccini

1 December 2014 in International Journal of Production Economics
Verified
Journal Article
Closed access
PCPaola Cappanera
Paola Cappanera
Filippo VisintinFilippo Visintin
Filippo Visintin
CBCarlo Banditori
Carlo Banditori

17 January 2013 in IMA Journal of Management Mathematics
Verified
Journal Article
Closed access
PDF file
CBCarlo Banditori
Carlo Banditori
PCPaola Cappanera
Paola Cappanera
Filippo VisintinFilippo Visintin
Filippo Visintin
This paper addresses the master surgical scheduling problem. First, we present a mixed integer programming model. The model assumes that the cases in a hospital's waiting list can be classified into homogeneous surgery groups based on the resources (e.g. operating room, post-surgical beds) that they are expected to require. Hence, it produces a solution that indicates, for each day of the month and for each time slot of the day, the number of cases to treat and the surgery group these cases must belong to. The model maximizes the patient throughput, takes into account the cases' due dates and allows for control of the waiting list. Secondly, we illustrate the results of a simulation study through which we test the model solution's robustness against the randomness of surgery duration and the length of stay. Finally, we present a combined optimization–simulation approach that allows us to fine tune the optimization model to trade-off robustness and efficiency. Our study shows that, by planning surgery groups instead of individual cases and by combining optimization and simulation, it is possible to obtain schedules that are both robust and easy to implement. In addition, it shows that such a combined approach allows for the performance of more accurate scenario analyses. The results presented in this paper are based on real data from the Meyer University Children's Hospital in Florence, which is one of the most renowned children's hospitals in Italy.

3 April 2017 in Production Planning & Control
Verified
Journal Article
Closed access
Filippo VisintinFilippo Visintin
Filippo Visintin
PCPaola Cappanera
Paola Cappanera
CBCarlo Banditori
Carlo Banditori
PDPamela Danese
Pamela Danese
In this study, we report the results of an action research project whose aim was to develop and implement an operating room scheduler at the Meyer University Children’s Hospital. The study offers insights into the features that make an MSS optimisation model and scheduler effective and easy to implement, and shed light on those actions facilitating their introduction and use. Specifically, it suggests that creating an effective operating room scheduler requires clustering patients in homogeneous surgery groups and developing a flexible tool that allows: scheduling surgery groups instead of actual patients, easily adding/removing constraints, changing the objective function(s) and adjusting the planning horizon. In addition, it posits that gaining the commitment of top management by showing credible preliminary results, inferring stakeholder preferences by letting them comment on tentative schedules, introducing changes gradually and involving staff at lower levels of the hospital hierarchy can significantly facilitate the scheduler development and implementation.