Yuan FANG

Dr. Yuan FANG


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 June 2019 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
YFYuan FANG
Yuan FANG
SNS. Thomas Ng
S. Thomas Ng
Purpose: Precast construction has become increasingly popular in the construction industry. Nonetheless, the logistics of construction materials has been a neglected topic, and this neglect has resulted in delays and cost overruns. Careful planning that considers all of the factors affecting construction logistics can ensure project success. The purpose of this paper is to examine the potential for using genetic algorithms (GAs) to derive logistics plans for materials production, supply and consumption. Design/methodology/approach: The proposed GA model is based on the logistics of precast components from the supplier’s production yard, to the intermediate warehouse and then to the construction site. Using an activity-based costing (ABC) approach, the model not only considers the project schedule, but also takes into account the production and delivery schedule and storage of materials. Findings: The results show that GAs are suitable for solving time-cost trade-off problems. The optimization process helps to identify the activity start time during construction and the delivery frequency that will result in the minimal cost. What-if scenarios can be introduced to examine the effects of changes in construction logistics on project outcomes. Originality/value: This paper presents a method for using GAs and an ABC approach to support construction logistics planning decisions. It will help construction planners and materials suppliers to establish material consumption and delivery schedules, rather than relying on subjective judgment.

18 August 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YCYuan Chen
Yuan Chen
YZYuwei Zhou
Yuwei Zhou
WFWeimin Feng
Weimin Feng
YFYuan FANG
Yuan FANG
AFAnqi Feng
Anqi Feng
Prefabricated buildings and off-site construction are increasingly adopted in modern construction. As one of the most concerning environmental impacts, the embodied carbon emission of prefabricated buildings has been extensively investigated in recent years. Due to the various influencing factors of carbon quantification, such as building characteristics, quantification boundary, emission sources, and quantification methods, no consensus has been reached so far. The impacts of the influencing factors on carbon quantification remain unclear. To fill this gap, this paper provides a systematic review and meta-analysis to comprehensively evaluate the recent research concerning the quantification of the embodied carbon emission of prefabricated buildings. In total, 43 peer-reviewed articles (96 building cases) were screened and analyzed. Twelve influencing factors of embodied carbon quantification have been identified and analyzed to give rise to a synthesized conclusion. The results of the meta-analysis indicated that the embodied carbon emission of prefabricated buildings varied significantly from 26.6 to 1644.4 kgCO2e/m2 in the reviewed literature. The results showed that some of the quantification factors could significantly influence the quantification results, such as the building structure forms, level of prefabrication, type of greenhouse gas considered, and data sources, while some factors have a lesser impact on carbon quantification results, such as the function of the building, quantification methods adopted, quantification tools/software used, and carbon inventory databases applied. The findings of this research provide readers with an in-depth and critical understanding of the quantification of the embodied carbon emission of prefabricated buildings. Research gaps and suggestions for future research are also provided based on the results of this work.

30 September 2022 in Journal of Environmental and Public Health
Verified
Journal Article
Open access
PDF file
Hongyang LiHongyang Li
Hongyang Li
TJTingting Jiang
Tingting Jiang
Peng MaoPeng Mao
Peng Mao
JZJunwei Zheng
Junwei Zheng
YFYuan FANG
Yuan FANG
DWDi Wu
Di Wu
China is experiencing the rapid development of infrastructure projects throughout the country, especially in the Guangdong‐Hong Kong SAR‐Macao SAR Greater Bay Area. This is placing the Chinese construction industry under tremendous pressure to transition to a sustainability orientation due to the various economic, social, and environmental challenges involved. The transition to more sustainable infrastructure projects requires the involvement of more stakeholders, while the multistakeholder context is of less importance when making project decisions, and this may create an adverse effect on the sustainability level of infrastructure projects. Based on the questionnaire data collected, this study addresses this issue by comparatively analysing stakeholder perceptions of sustainable infrastructure delivery between Guangdong province, Hong Kong SAR, and Macao SAR. Through independent sample t‐tests, the disparity in perceptions between paired stakeholder groups in the Greater Bay Area (as a whole) is revealed. Three pairs, i.e., government department and supervising engineers, owners and designers, and supervising engineers and operators, are found to be the most conflicting, while contractors and supervising engineers are the least. Of the 18 sustainability items analysed, shaped local identity and international reputation (SOC, social factor 8) is the most controversial, while value-for-money of the proposed project during its lifecycle (EOC, economic factor 5) and green design and construction (ENV, environmental factor 2) have the greatest consensus towards their roles in achieving project sustainability. Significantly, different stakeholder perceptions between the three are also identified, and the contractor group is found to share the least consensus geographically, while the operators have the least conflict rating of the relevant importance of various sustainability factors. The thorough analysis of sustainability‐related items of economy, society, and environment contributes to understanding the attitudes of the various stakeholder groups involved, which then helps reduce their conflicts during sustainable infrastructure delivery.

20 June 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
YFYuan FANG
Yuan FANG
XSXinyi Shi
Xinyi Shi
YCYuan Chen
Yuan Chen
JHJialiang He
Jialiang He
With rapid urban development, the “waste-free city” concept has emerged. Therefore, the accurate prediction of the amount of C&D waste is of great importance. However, many countries and regions, including China, have not yet established C&D waste databases and standard prediction methods. This study proposed a method using a weighted combination of the grey theory model (GM) and the autoregressive integrated moving average (ARIMA) model to predict the quantity of urban C&D waste in the future. Based on a case study in Guangzhou, this study compared the prediction results of three prediction models, namely the GM, the ARIMA, and the proposed weighted combined model of the GM and the ARIMA (GM-ARIMA). The results of this study proved that the proposed combined GM-ARIMA model had a better predictive performance than both the separated models. The mean absolute percentage errors (MAPE) of the GM and ARIMA models were 12.11% and 14.26%, respectively, whereas the proposed GM-ARIMA model had a lower MAPE (8.5%). This study found that the generation of C&D waste in Guangzhou will continue to grow steadily. From 2024 to 2035, the quantity of C&D waste is expected to reach 850 million tons cumulatively, with an annual growth rate of 7.1%.

27 October 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YFYuan FANG
Yuan FANG
JHJialiang He
Jialiang He
XWXi Wang
Xi Wang
WXWensheng Xu
Wensheng Xu
JKJung In Kim
Jung In Kim
XCXingbin CHEN
Xingbin CHEN
This study explores the use of construction robots with collaborative path planning and coordination in complex building construction tasks. Current construction processes involving robots are often fragmented due to their single-task focus, with limited research focused on employing multiple construction robots to collaboratively perform tasks. To address such a challenge, this research proposes an improved A* algorithm for global path planning and obstacle avoidance, combined with the development of a BIM-based grid map of the construction site. The leader–follower method is utilized to guide the robot group in maintaining an optimal formation, ensuring smooth collaboration during construction. The methodology includes formalizing building construction site environments into BIM-based grid maps, path planning, and obstacle avoidance, which allows robot groups to autonomously navigate and complete specific tasks such as concrete, masonry, and decoration construction. The results of this study show that the proposed approach achieves significant reductions in pathlength and operational time of approximately 9% and 10%, respectively, while maintaining safety and efficiency compared with traditional manual methods. This research demonstrates the potential of collaborative construction robot groups to enhance productivity, reduce labor costs, and provide a scalable solution for the intelligent transformation of the construction industry; extends the classical A* algorithm by incorporating obstacle density into the heuristic function; and proposes a new node simplification strategy, contributing to the literature on robot motion planning in semi-structured environments.

6 January 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
YCYuan Chen
Yuan Chen
RHREX Ho
REX Ho
YFYuan FANG
Yuan FANG
DLDongxu Li
Dongxu Li
XWXi Wang
Xi Wang
Green construction evaluation systems can assist building stakeholders in scientifically evaluating the carbon emission performance of construction projects. However, most green construction evaluation tools and methods fail to explicitly incorporate construction carbon emission indicators, let alone a quantitative evaluation. Therefore, this study proposes a carbon emission evaluation system based on the entropy–TOPSIS and K-means methods for foundation construction projects. In this study, we innovatively divided the carbon emission of the foundation construction process into three phases, namely, transportation emission, excavation and earthwork emission, and pile work emission, considering their different emission characteristics and reduction difficulties by nature. Different from traditional carbon evaluation methods, the carbon emission of the three phases were evaluated separately against the baseline value obtained from local construction quota. After that, the emission performance of the three phases was weighted and evaluated based on the entropy–TOPSIS method, and then rated via the K-means method. Based on a case study of 19 residential buildings, the weights of the three construction phases were 27.66% (transportation), 42.34% (excavation and earthwork), and 29.99% (pile work). The carbon performance of the 19 cases were rated by the K-means method into four levels: six cases were rated “Excellent”, five were rated “Good”, five were rated “Fair”, and three were rated “Poor”. The proposed method was expected to objectively and scientifically evaluate and rate the carbon emission of the foundation construction process, and provided a theoretical basis for decision makers to identify emission hotspots and formulate specific carbon reduction measures.