Xiaohua Ding

Dr. Xiaohua Ding


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 March 2024 in Water
Verified
Journal Article
Open access
PDF file
ZYZhongao Yang
Zhongao Yang
XDXiaohua Ding
Xiaohua Ding
XLXin Liu
Xin Liu
AWAbdoul Wahab
Abdoul Wahab
ZAzhongchen ao
zhongchen ao
PMPenglin Ma
Penglin Ma
The instability of geological slopes in mining environments poses a significant challenge to the safety and efficiency of operations. Waste Dump#2 at the Ziluoyi Iron Mine in China is a notable case study that highlights the challenges associated with sizable base slopes and large step heights. To address hidden hazards in the mine and the above issues, an inclusive investigation is carried out to examine the physical and mechanical properties of the soil–rock slope through indoor testing and analyze the deformation mechanisms of the slope using numerical simulations, taking various factors into account. The study reveals that the stability of Waste Dump#2 is deeply affected by weight, groundwater conditions, earthquake loading, and rainfall. To this end, the cohesion and internal friction parameters of the soil–rock slope are first determined through direct shear tests, which show a cohesion of 6.215 kPa at the top of the slope and an internal friction angle of 34.12°. By adopting GEO-SLOPE, 3D Mine, and AutoCAD software, stability calculations of the slope are performed, which give stability coefficients of 1.547 under normal conditions, 1.276 in rainfall, and 1.352 in seismic conditions. These results meet safety standards and ensure the safe and efficient operation of the mine.

27 February 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
XDXiaohua Ding
Xiaohua Ding
ZAzhongchen ao
zhongchen ao
Xiaoshuang LiXiaoshuang Li
Xiaoshuang Li
SXShuangshuang Xiao
Shuangshuang Xiao
JWJingyu Wang
Jingyu Wang
DZDonghua Zhang
Donghua Zhang
Step blasting is an important part of open-pit mining, which is accompanied by hazards such as large blasting blocks, flying stone splashing, blasting noises, and blasting dust during the blasting process. In order to reduce the harm caused by blasting, this paper uses impact dynamics and rock dynamics to explain the deformation damage and motion law caused by detonation of the material blocked by the gun hole. By simulating the motion of the blocked material in the gun hole, the motion and failure characteristics of the blocked material in the gun hole are revealed. In this paper, geological polymer is introduced into the field of open-pit mine blasting, and 700 g rock powder, 200 g slag, 40 g NaOH solution (30%), and 140 g water glass with a modulus of 3.2 and 80 g of water are selected to prepare geological polymer-modified plugging materials to change rock powder blockage from bulk to solid, and improve the plugging performance. Finally, a field test was carried out in the open-pit mine explosion area, and a comparative test was carried out through the high-speed photography system; it is demonstrated that the modified blocking material could improve the blockage ability of the gun hole, reduce the large block rate of the upper part of the step, reduce the amount of dust, reduce the amount of flying stone, and improve the production efficiency and safety.

18 April 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZYZhongao Yang
Zhongao Yang
XLXin Liu
Xin Liu
WQWeimin Qian
Weimin Qian
XDXiaohua Ding
Xiaohua Ding
ZAzhongchen ao
zhongchen ao
AWAbdoul Wahab
Abdoul Wahab
Using a combination of experimental and numerical methods, this study examines the stability of the slope of Waste Dump#1 in Ziluoyi Iron Mine. We conducted direct shear tests on soil samples taken from the waste dump, which provided important insights into slope stability. The tests identified key mechanical parameters, including an average cohesion of 4.80 kPa and an internal friction angle of 25.63°. By implementing GEO-SLOPE software, we could determine that the slope stability factor is 1.047, which is far from the required safety standards. To address this issue, we proposed an appropriate rectification strategy including the construction of safety platforms and reconfiguration of the slope structure. This approach effectively improved the slope stability factor to 1.219 and met the safety criteria. In addition, particle flow code (PFC) simulations were methodically performed to model the slope morphology and particle displacement before and after rectification. The obtained results revealed a remarkable reduction in sliding areas and particle displacement post-rectification, enhancing mine safety and efficiency. Our findings provide valuable insights into the application of combined experimental and numerical methods to assess and improve slope stability in open-pit mines, which will substantially contribute to the field of geotechnical engineering and mining safety.

13 March 2015 in Journal of Central South University
Verified
Journal Article
Closed access
PDF file
XDXiaohua Ding
Xiaohua Ding
KLKe-Min Li
Ke-Min Li
SXShuang-Shuang Xiao
Shuang-Shuang Xiao
WHWei-Min Hu
Wei-Min Hu

1 August 2025 in Sensors
Verified
Journal Article
Open access
PDF file
JLJiangfeng Li
Jiangfeng Li
JQJiahao Qin
Jiahao Qin
KKKaimin Kang
Kaimin Kang
MLMingzhi Liang
Mingzhi Liang
KLKunpeng Liu
Kunpeng Liu
XDXiaohua Ding
Xiaohua Ding
Landslide displacement prediction is crucial for disaster mitigation, yet traditional methods often fail to capture the complex, non-stationary spatiotemporal dynamics of slope evolution. This study introduces an enhanced prediction framework that integrates multi-scale signal processing with dynamic, geology-aware graph modeling. The proposed methodology first employs the Maximum Overlap Discrete Wavelet Transform (MODWT) to denoise raw Global Navigation Satellite System (GNSS)-monitored displacement time series data, enhancing the underlying deformation features. Subsequently, a geology-aware graph is constructed, using the temporal correlation of displacement series as a practical proxy for physical relatedness between monitoring nodes. The framework’s core innovation lies in a dynamic graph optimization model with low-rank constraints, which adaptively refines the graph topology to reflect time-varying inter-sensor dependencies driven by factors like mining activities. Experiments conducted on a real-world dataset from an active open-pit mine demonstrate the framework’s superior performance. The DCRNN-proposed model achieved the highest accuracy among eight competing models, recording a Root Mean Square Error (RMSE) of 2.773 mm in the Vertical direction, a 39.1% reduction compared to its baseline. This study validates that the proposed dynamic graph optimization approach provides a robust and significantly more accurate solution for landslide prediction in complex, real-world engineering environments.

10 April 2025 in Scientific Reports
Verified
Journal Article
Open access
PDF file
ZLZhouquan Liao
Zhouquan Liao
XDXiaohua Ding
Xiaohua Ding
MLMingzhi Liang
Mingzhi Liang
JLJiangfeng Li
Jiangfeng Li
ZYZhongao Yang
Zhongao Yang
YZYan Zhang
Yan Zhang
Open-pit coal mining often employs loosening blasting, with perforation blasting accounting for a significant portion of the coal seam mining costs. For coal of the same quality, the price of lump coal is much higher than that of crushed coal. Therefore, reducing the percentage of crushed coal in the blasting process is an important means to improve quality and efficiency in open-pit coal mining. How to develop a reasonable blasting scheme based on actual geological conditions has been a hot topic among scholars. In response to this issue, this study combines numerical simulation and field tests. Using the LS-DYNA software’s fluid–solid coupling algorithm, the effects of charge structure, explosive type, intermediate medium, and hole spacing parameters on blasting results are analyzed. An optimized blasting scheme is determined, with specific parameters including a charge spacing of 7 m, hole spacing of 11 m, charge structure with a 5 m blocking length, 4 m upper charge length, 2 m intermediate coal powder spacing, and 5 m lower charge length, using low-density explosives. This optimized scheme is applied in field tests, and a comparison with the control group shows that the fines rate decreased from 30.10 to 24.17%, a reduction of 5.93%; the lump coal proportion increased from 59.33 to 68.41%, an increase of 9.08%; and the proportion of large coal lumps decreased from 10.57 to 7.42%, a decrease of 3.15%. The fines rate and large lump rate decreased in the experimental group compared to the control group, improving blasting efficiency and effectively reducing the downtime of the surface production system due to blockages. This study not only provides theoretical guidance for blasting in soft coal seams of open-pit coal mines but also offers scientific support for practical engineering applications, demonstrating significant engineering value and broad application prospects.