Electric multiple unit (EMU) trains’ high-level maintenance planning is a discrete problem in mathematics. The high-level maintenance process of the EMU trains consumes plenty of time. When the process is undertaken during peak periods of the passenger flow, the transportation demand may not be fully satisfied due to the insufficient supply of trains. In contrast, if the process is undergone in advance, extra costs will be incurred. Based on the practical requirements of high-level maintenance, a 0–1 programming model is proposed. To simplify the description of the model, candidate sets of delivery dates, i.e., time windows, are generated according to the historical data and maintenance regulations. The constraints of the model include maintenance regulations, the passenger transportation demand, and capacities of workshop. The objective function is to minimize the mileage losses of all EMU trains. Moreover, a modified particle swarm algorithm is developed for solving the problem. Finally, a real-world case study of Shanghai Railway is conducted to demonstrate the proposed method. Computational results indicate that the (approximate) optimal solution can be obtained successfully by our method and the proposed method significantly reduces the solution time to 500 s.
Service network design is fundamentally crucial for railway express cargo transportation. The main challenge is to strike a balance between two conflicting objectives: low network setup costs and high expected operational incomes. Different configurations of these objectives will have different impacts on the quality of freight transportation services. In this paper, a bi-level programming model for the railway express cargo service network design problem is proposed. The upper-level model forms the optimal decisions in terms of the service characteristics, and the low-level model selects the service arcs for each commodity. The rail express cargo is strictly subject to the service commitment, the capacity restriction, flow balance constraints, and logical relationship constraints among the decisions variables. Moreover, linearization techniques are used to convert the lower-level model to a linear one so that it can be directly solved by a standard optimization solver. Finally, a real-world case study based on the Beijing–Guangzhou Railway Line is carried out to demonstrate the effectiveness and efficiency of the proposed solution approach.