Rapheal Ojelabi

Rapheal Ojelabi


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2018 in Data in Brief
Verified
Journal Article
Open access
LALekan Amusan
Lekan Amusan
AAAdedeji Afolabi
Adedeji Afolabi
RORapheal Ojelabi
Rapheal Ojelabi
IOIgnatius Omuh
Ignatius Omuh
HOHilary I. Okagbue
Hilary I. Okagbue
This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project.

21 December 2016 in Journal of Construction in Developing Countries
Verified
Journal Article
Open access
OOOpeyemi Olanrewaju Oyeyipo
Opeyemi Olanrewaju Oyeyipo
KOKoleola Tunwase Odusami
Koleola Tunwase Odusami
RORapheal Ojelabi
Rapheal Ojelabi
AAAdedeji Olushola Afolabi
Adedeji Olushola Afolabi
Bidding is the most common means by which contractors obtain work. The construction industry accounts for approximately three quarters of the Gross Domestic Product (GDP) in the country. It is generally believed that wrong bidding practice is a major contributor to the construction industry's inefficiency. This means that any improvement in bidding has the potential to enhance the industry's performance, improve the quality of the decision-making process and assist in achieving the strategic objective of contracting organisations. In an effort to uncover the main factors that characterise the bid/no bid decision of contracting organisations, a study to evaluate the factors that affect contractors' decisions to bid for a project and to evaluate the importance of the identified factors to decision makers was conducted. A structured questionnaire was used as the principal instrument for collecting data from respondents. A total sample of 100 was drawn from these collections of construction contractors from Lagos state. Fifty were completed and returned, representing a 50% response rate. Frequency, percentage, mean score and Spearman's correlation were used in analysing data collected for the study. The results indicate that the financial capability of clients, availability of capital and availability of material are the most important factors that contractors consider when making a bid/no bid decision. The study also reveals that competition (number and identity of competitors) does not have significant influence on contractors' bidding decisions. The study recommends that contractors should also build their reputations in the construction industry by acquiring technical competencies and capabilities as these qualities have become important considerations in assessing contractors' competiveness, as well as being key indicators of successful tendering in construction projects.

1 June 2020 in Engineering Management in Production and Services
Verified
Journal Article
Open access
PDF file
Innocent Chigozie OsuizugboInnocent Chigozie Osuizugbo
Innocent Chigozie Osuizugbo
RORapheal Ojelabi
Rapheal Ojelabi
Growing demands for building projects result from economic development. The building industry is dynamic and multifaceted. Efficient and effective practice of building production management (BPM) is required to successfully execute projects and achieve project goals upon completion as well as functionality aims for the lifespan of a building. This research aims to determine factors that influence the BPM practice in the Nigerian construction industry, particularly; during the project execution phase. A cross-sectional survey used; a questionnaire to identify 73 factors, which were grouped into 12 categories and assessed. A purposive sampling technique was used to identify 20 construction organisations specialising in building production management in Lagos, Nigeria. 114 questionnaires were distributed to the pool of stakeholders, which included 31 clients, 34 consultants and 49 contractors of current and past building production projects carried out by the selected firms in Lagos. The research used a selection of statistical tools for SPSS v.23, including the chi-square test, the Kruskal-Wallis test and Kendall's coefficient of concordance. The obtained result revealed the factors that mostly influence the BPM practice namely, architectural drawings, the construction programme document, the work breakdown structure, the adequacy of communication and coordination between the parties, the adequacy of raw materials and equipment, the availability of the competent team, the implementation of the safety management system, regular maintenance of project equipment, clear and timely inspections, the availability of funds as planned throughout the project duration, the availability of skilled personnel, and the aesthetics of the completed work. The research resulted in the development of the BPM implementation framework and recommendations for the improvement of the BPM practice in Nigeria.

1 June 2018 in Data in Brief
Verified
Journal Article
Open access
AAAdedeji Afolabi
Adedeji Afolabi
RORapheal Ojelabi
Rapheal Ojelabi
ABAdewale Bukola
Adewale Bukola
AAAdedotun Akinola
Adedotun Akinola
AAAdesola Afolabi
Adesola Afolabi
Lagos, by the UN standards, has attained the megacity status, with the attendant challenges of living up to that titanic position; regrettably it struggles with its present stock of housing and infrastructural facilities to match its new status. Based on a survey of construction professionals' perception residing within the state, a questionnaire instrument was used to gather the dataset. The statistical exploration contains dataset on the state of housing and urban infrastructural deficit, key indicators spurring the investment by government to upturn the deficit and improvement mechanisms to tackle the infrastructural dearth. Descriptive statistics and inferential statistics were used to present the dataset. The dataset when analyzed can be useful for policy makers, local and international governments, world funding bodies, researchers and infrastructural investors.

1 April 2018 in Data in Brief
Verified
Journal Article
Open access
AAAdedeji Afolabi
Adedeji Afolabi
RORapheal Ojelabi
Rapheal Ojelabi
PTPatience F. Tunji-Olayeni
Patience F. Tunji-Olayeni
OFOlabosipo I. Fagbenle
Olabosipo I. Fagbenle
TMTimothy O. Mosaku
Timothy O. Mosaku
The unique qualities of women can make them bearers of solutions towards achieving sustainability and dealing with the dangers attributed to climate change. The attitudinal study utilized a questionnaire instrument to obtain perception of female construction professionals. By using a well-structured questionnaire, data was obtained on women participating in green jobs in the construction Industry. Descriptive statistics is performed on the collected data and presented in tables and mean scores (MS). In addition, inferential statistics of categorical regression was performed on the data to determine the level of influence (beta factor) the identified barriers had on the level of participation in green jobs. Barriers and the socio-economic benefits which can guide policies and actions on attracting, retaining and exploring the capabilities of women in green jobs can be obtained from the survey data when analyzed.

14 August 2018 in Buildings
Verified
Journal Article
Open access
PDF file
DNDavid Nduka
David Nduka
JAJohn O. Ameh
John O. Ameh
OJOpeyemi Joshua
Opeyemi Joshua
RORapheal Ojelabi
Rapheal Ojelabi
Self-cured concrete is a type of concrete with a special ability to reduce autogenous shrinkage responsible for early-stage cracking. It is useful generally for the construction of high rise buildings and bridges. The application and use of this technique of curing concrete, however, depends on the level of awareness among stakeholders regarding the application of the technique and its benefits among other factors. This study, therefore, sets out to investigate the level of awareness of selected construction professionals regarding the self-curing concrete technique in addition to the benefits. A cross-sectional survey design method was embraced by giving out 115 questionnaires to builders and engineers in Lagos who were purposely selected. The data was subjected to descriptive statistics. The results indicate that about 21% of selected builders and civil engineers practicing in Lagos are not aware and familiar with the concept of self-curing technology while about 43.1% of the professionals who have the knowledge of SCT have never used it in their professional practice. In addition, lower permeability, reduced coefficients of thermal expansion, and improved microstructures of cementitious paste were perceived as the dominant benefits of the self-curing concrete method. The implication of this study to construction professionals in Nigeria is in developing capacities on innovation practices in high-strength concrete technologies that will make them strike a balance with international counterparts.