The substantial contribution of buildings in the energy consumption and emissions renders the existing building stock a key element to tackle the climate crisis. Consequently, defining a deliberate decision-making process gains importance. Decisions are currently often based on building codes, budget, and in the best case Pareto optimality of the energy performance and the net present value of the life-cycle cost. The growing attention to sustainability, however, raises questions about the effect of environmental considerations on the outcome of the Pareto optimal solutions. This study quantifies the effect of including the environmental aspect as a third dimension to the current evaluation approach. Therefore, the most appropriate renovation measures are selected using a multidimensional Pareto optimization. The method is applied to a residential high-rise building in Belgium. Firstly, the Pareto front is constituted based on life-cycle costing and life-cycle assessment separately. Subsequently, the respective results are combined into an integrated life cycle approach by enumerating the LCA results as an external cost to the LCC results. The results show that the Pareto optimal solutions from a financial and environmental perspective do not coincide. Although the financial aspect dominates, adding the environmental cost eliminates low-performant financial optima, leading to optimal solutions with a larger insulation thickness.
The environmental impact of building energy renovation is commonly evaluated through life cycle assessment (LCA). However, existing LCA studies often overlook the energy performance gap—a substantial disparity between calculated and actual energy use—when estimating operational energy use before and after renovation. This paper examines the influence of the energy performance gap on the comparative LCA between unrenovated and renovated buildings. First, a statistical correction model, based on a recent large-scale Flemish study, is developed to correct regulatory calculated energy use for space heating and domestic hot water in a pragmatic way. Subsequently, the model is applied to four single-family dwellings with different energy characteristics that underwent renovation in accordance with Flemish energy regulations. The results show that the anticipated environmental savings over a 60-year study period decrease significantly when the correction model is applied, reducing the estimated savings of 49–80% to 21–49%. Moreover, environmental payback times increase from 2.9–9.1 years to 10.4–22.5 years. Notably, neglecting the energy performance gap in LCAs leads to systematic underestimations of the material use significance. This research underscores the importance of integrating the energy performance gap into LCAs to obtain more accurate estimations of the environmental benefits of energy renovations.
1 November 2020 in IOP Conference Series: Earth and Environmental Science
The European existing building stock contributes to 40% of the total energy use and 36% of the CO2 emissions. To deal with the climate crisis, European climate and energy objectives were defined. By 2050, CO2 emissions should be cut to 80-95% compared to 1990 and all buildings must be energy-neutral. The North-Sea Region alone consists of 22 million outdated dwellings built between 1950 and 1985 that are in high need of renovation. Nowadays, the renovation industry applies mainly manual on-site renovation techniques, resulting in a low renovation pace, relatively high labour costs and a long duration. To tackle the urgent need for rapid renovations, six countries of the North-Sea Region collaborate to upscale the current renovation process in the Interreg project INDU-ZERO “Industrialization of house renovations toward energy-neutral”. The project focuses on modular prefabricated renovation packages with fully integrated HVAC technologies to arrive at energy-neutral dwellings. The project researches the possibilities of far-reaching automated and industrialized production processes. A smart factory blueprint will be designed to speed up the renovation pace to a target of 15,000 renovation packages per year per factory while cutting the current price with 50%. This contribution focusses on three main topics: material use, operational energy use and transport. Firstly, the reasoning behind the renovation package design is explained. Next, the packages are adopted on an archetype dwelling to document the thermal performance before and after renovation. Finally, the associated logistics are studied. To summarize each individual research in a blanket result, the environmental impact is determined and compared to the non-renovated dwelling.