Xinyu Wang

Prof. Xinyu Wang


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2017 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
YLYan Li
Yan Li
XWXinyu Wang
Xinyu Wang
YWYahui Wang
Yahui Wang
The global expansion of public-private partnerships (PPPs) has generated interest in risk allocation for PPP projects. Many previous researchers have shown that without proper risk allocation, PPP projects cannot be successful. Current research is limited to equilibrium allocation of risk. The objective of this study is to improve this situation by constructing an alternating offer bargaining game model of risk allocation between two players involved in PPP projects, i.e., the public and private sector. Risk allocation can be analyzed as a game to more fully reflect the bargaining process among the parties. Equilibrium risk allocation outcomes were analyzed for the two cases in which the bargaining process was initiated in the first round by the public or private sector, and shows that risk allocation ratio is associated with the sequence of alternating offer, discount factor, and asymmetric degree of information. The probability, severity, and impact of risk factors were considered to prioritize ...

20 December 2016 in Journal of Risk Research
Verified
Journal Article
Closed access
YLYan Li
Yan Li
XWXinyu Wang
Xinyu Wang
Public–private partnerships (PPP) have been widely used in China to procure public facilities and services. Complicated problems in PPP projects in China arise because of a variety of risk factors. A proper risk assessment model is needed to identify risks and provide risk response strategies for future Chinese PPP projects. The fuzzy analytic hierarchy process (F-AHP) method provides the ability to solve complex risk assessment of PPP projects. Current risk assessment models are limited to PPP projects in specific countries and do not consider unique risks in China, especially political, economic, social, and legal risks. This paper designed a risk evaluation index system for PPP projects based on the Delphi expert investigation method, and then established an optimized risk evaluation model for PPP projects in China using the F-AHP method. The risks identified are confirmed by interviewing experts from Chinese local government departments, private enterprise, third-party intermediary consulting and regulatory agencies, and academic organizations. The results show that the risks that ranked among the top ten are closely related to China’s political and economic policies and relationships among stakeholders. It can be concluded that government authorities play a critical role in providing a favorable political, social, and economic environment and an effective institutional framework for PPP projects. Furthermore, it is also important to deal with relationships among stakeholders based on the public–private ‘win–win’ principle. This study provides risk response strategies, addressing key issues from eight aspects: an impeccable legal and regulatory framework; a central coordinating and regulating PPP authority; supportive governmental authorities; institutional capacity-building; favorable economic conditions and viability; community, partner, and moral accountability; clear division of responsibilities through contracts; and effective advisory management. These effective measures may be useful in reducing the adverse effects of risk for PPP projects in China.

1 December 2021 in Resources Policy
Verified
Journal Article
Closed access
XTXueping Tan
Xueping Tan
Yong GengYong Geng
Yong Geng
AVAndrew Vivian
Andrew Vivian
XWXinyu Wang
Xinyu Wang

8 February 2019 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
YLYan Li
Yan Li
XWXinyu Wang
Xinyu Wang
The public-private partnership (PPP) has been adopted globally to meet intensifying demands for public facilities and services. However, PPP projects contain a variety of risks which may lead to project failure. Many researchers have explored risk factors associated with PPP projects in developing countries. However, these investigations have limited their aim to understanding risk impact without considering the interactions of these factors. Hence, to fill this gap, this study proposes a risk assessment method, addressing vital interrelationships and interdependencies. Two methodologies, fuzzy analytic network process (F-ANP) and interpretive structural modeling (ISM), were applied to avoid vagueness and data inaccuracies. The primary contributions of this paper were considering the relationships among risk factors and risk priority; and offering a risk analysis approach based on linguistic scales and fuzzy numbers to reflect different neutral, optimistic and pessimistic viewpoints from expert respondents’ judgments. Results from this analysis showed that legal and policy risk was the most influential and interdependent risk, and interest rate risk was the most essential risk in Chinese PPP projects. The ISM structure diagram demonstrated that most of 35 identified risk factors had high driving and dependence power. This study proposed a systematic and practical method to identify and assess PPP risk factors, utilizing an integrated approach consisting of F-ANP and ISM, which has not been used for risk assessment in the construction field. This paper provides a new risk assessment tool and a basis for risk management strategies in the construction engineering and management field.


1 November 2021 in Finance Research Letters
Verified
Journal Article
Closed access
YXYan Xu
Yan Xu
XWXinyu Wang
Xinyu Wang
HLHening Liu
Hening Liu