Jorge Ochoa

Dr. Jorge Ochoa

School of Natural and Built Environment, University of South Australia, Adelaide, South Australia 5001, Australia
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2011 in Habitat International
Verified
Journal Article
Closed access
LSLi-Yin Shen
Li-Yin Shen
Jorge OchoaJorge Ochoa
Jorge Ochoa
MSMona N. Shah
Mona N. Shah
XZXiaoling Zhang
Xiaoling Zhang

1 September 2010 in Journal of Cleaner Production
Verified
Journal Article
Closed access
GQG.Y. Qi
G.Y. Qi
LSL.Y. Shen
L.Y. Shen
SZS.X. Zeng
S.X. Zeng
Jorge OchoaJorge Ochoa
Jorge Ochoa

1 April 2015 in Journal of Cleaner Production
Verified
Journal Article
Closed access
YTYongtao Tan
Yongtao Tan
Jorge OchoaJorge Ochoa
Jorge Ochoa
CLCraig Langston
Craig Langston
LSLiyin Shen
Liyin Shen

1 August 2018 in Habitat International
Verified
Journal Article
Closed access
Jorge OchoaJorge Ochoa
Jorge Ochoa
YTYongtao Tan
Yongtao Tan
QQQueena K. Qian
Queena K. Qian
LSLiyin Shen
Liyin Shen
EMEduardo López Moreno
Eduardo López Moreno

1 March 2019 in Journal of Cleaner Production
Verified
Journal Article
Closed access
JCJindao Chen
Jindao Chen
LSLiyin Shen
Liyin Shen
QSQian Shi
Qian Shi
JHJingke Hong
Jingke Hong
Jorge OchoaJorge Ochoa
Jorge Ochoa

28 January 2022 in Buildings
Verified
Journal Article
Open access
PDF file
KMKieran William May
Kieran William May
CKChandani Kc
Chandani Kc
Jorge OchoaJorge Ochoa
Jorge Ochoa
Ning GuNing Gu
Ning Gu
JWJames Walsh
James Walsh
BTBruce Thomas
Bruce Thomas
This article presents our findings from a three-stage research project, which consists of the identification, development, and evaluation of a defect management Augmented Reality (AR) prototype that incorporates Building Information Modelling (BIM) technologies. Within the first stage, we conducted a workshop with four construction-industry representatives to capture their opinions and perceptions of the potentials and barriers associated with the integration of BIM and AR in the construction industry. The workshop findings led us to the second stage, which consisted of the development of an on-site BIM-based AR defect management (BIM-ARDM) system for construction inspections. Finally, a study was conducted to evaluate BIM-ARDM in comparison to the current paper-based defect management inspection approach employed on construction sites. The findings from the study revealed BIM-ARDM significantly outperformed current approaches in terms of usability, workload, performance, completion time, identifying defects, locating building elements, and assisting the user with the inspection task.