Cherif AIT AIDER

Mr. Cherif AIT AIDER

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 August 2024 in Energies
Verified
Journal Article
Open access
PDF file
BOBright Ebikemefa Okpeke
Bright Ebikemefa Okpeke
CACherif AIT AIDER
Cherif AIT AIDER
LBLars Baetcke
Lars Baetcke
Sören EhlersSören Ehlers
Sören Ehlers
During liquid hydrogen bunkering into a cryogenic tank, boil-off losses occur due to the high thermal gradient between liquid hydrogen and the warm surface of the tank. This leads to gaseous hydrogen release. Such losses constitute a significant drawback in using hydrogen as a fuel for maritime applications where bunkering operations are regularly carried out, thereby constituting a significant loss along the liquid hydrogen pathway. Due to the inherently low temperature of liquid hydrogen, boil-off losses are always present. Some boil-off losses cannot be eliminated because they are thermodynamically constrained or intrinsic to the system’s design. Boil-off recovery methods can be implemented to capture the boil-off; however, those solutions come with an additional cost and system complexities. Hence, this paper investigates the feasibility of minimizing boil-off losses during the first bunkering of liquid hydrogen or refilling of liquid hydrogen in an empty cryogenic tank by first precooling the cryogenic tank surface to decrease the thermal gradient between the liquid hydrogen and the tank surface/wall. In this paper, different media for precooling a cryogenic tank are evaluated to assess the boil-off reduction potential and the associated costs in order to identify the most suitable solution. The assessment has been carried out based on analytical formulation.

1 August 2025 in International Shipbuilding Progress
Verified
Journal Article
Closed access
SEShaghayegh Kazemi Esfeh
Shaghayegh Kazemi Esfeh
CACherif AIT AIDER
Cherif AIT AIDER
JDJorgen Depken
Jorgen Depken
Dheeraj Bharadwaj GosalaDheeraj Bharadwaj Gosala
Dheeraj Bharadwaj Gosala
LBLars Baetcke
Lars Baetcke
Sören EhlersSören Ehlers
Sören Ehlers
An increase in customer demand for cruising is prompting major industry players to allocate considerable resources to the construction of new ships that are energy efficient and environmentally compliant. This study examines the energy transition possibilities by retrofitting a large cruise ship and develops a procedure to evaluate the suitability of liquid hydrogen as a potential decarbonization solution. The utilized approach in this paper includes technical and safety assessment of the possible energy system options with liquid hydrogen as fuel, to identify the optimal solution. The technical assessment evaluates the required volume and weight of each system option using vessel particulars and operational data. The energy system sizing is based on available technology data in the market, and the sizing of fuel storage system is based on a sample liquid hydrogen containment system and its adaptability onboard. Additionally, a safety assessment of hydrogen storage and each energy system option is conducted, analysing the applicability onboard, with a focus on the frequency of hazardous events. This approach can be transferred to other ship types and further developed to compare other alternative fuels. Furthermore, it can be improved by incorporating economic and regulatory assessments. The results of a sample case study with installed 40 MW power onboard, indicate that decarbonization of cruise ships using liquid hydrogen is possible. Among studied scenarios, a system with 40 MW PEMFCs and 10 MW batteries is suggested as an optimum solution. This system, despite requiring 1.87 more volume, represents only 35% of conventional system weight. Within the ship body three large liquid hydrogen tanks are installed to provide 4926 m 3 fuel. Consequently, bunkering stops are required on a weekly basis.