Linxuan Liu

Ms. Linxuan Liu

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 September 2024 in Alexandria Engineering Journal
Verified
Journal Article
Open access
DXDai Xiaomin
Dai Xiaomin
LLLinxuan Liu
Linxuan Liu
ZCZhihe Cheng
Zhihe Cheng

19 May 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
LLLinxuan Liu
Linxuan Liu
WTWei Tian
Wei Tian
DXDai Xiaomin
Dai Xiaomin
LSLiang Song
Liang Song
The increasing complexity of highway electromechanical systems has created a critical need to improve the accuracy of resource consumption standards. Traditional deterministic methods often fail to capture inherent variability in resource usage, resulting in significant discrepancies between budget estimates and actual costs. To address this issue for a specific device, this study develops a probabilistic framework based on Monte Carlo simulation, using manual barrier gate installation as a case study. First, probability distribution models for key parameters were established by collecting and statistically analyzing field data. Next, Monte Carlo simulation generated 100,000 pseudo-observations, yielding mean labor consumption of 1.08 workdays (SD 0.29), expansion bolt usage of 6.02 sets (SD 0.97), and equipment shifts of 0.20 (SD 0.10). Comparison with the “Highway Engineering Budget Standards” (JTG/T 3832-2018) revealed deviations of 1% to 4%, and comparison with market bid prices showed errors below 2%. These results demonstrate that the proposed method accurately captures dynamic fluctuations in resource consumption, aligning with both national norms and actual tender data. In conclusion, the framework offers a robust and adaptable tool for cost estimation and resource allocation in highway electromechanical projects, enhancing budgeting accuracy and reducing the risk of cost overruns.