Purpose. The present paper aims to develop methodological principles for the selection of effective parameters of resource-saving technologies while developing water-bearing titanium-zirconium deposits basing on the complex of analytical studies. Methods. The paper applies a complex of research methods: analytical – to analyze and generalize the main differences of the development technology for water-bearing placer deposits and problem statement; technical-economic analysis for identifying the effect of a resource-saving technology on the indices of land use of the open-pit mining and involvement of associate raw materials in the economic activity; forecasting – to determine the influence on complex development of a titanium-zirconium deposit on the operating parameters of the regional nonmetallic raw material open pits. Findings. Effective trends in using the associate raw materials located in the enclosing and overburden rocks of a titanium-zirconium deposit are identified. Key differences between the technologies of associate raw material mining from the overburden rocks and their recovery from the enclosing rocks while mineral mining are defined. Predictive influence of a resource-saving technology of the development of titanium-zirconium deposits on the extraction of building materials from the regional nonmetallic open pits is specified. Volumes of possible associate raw material mining while developing the Motronivskyi GZK open pit during its operation are determined. Originality. New dependences of a land capacity coefficient while mining nonmetallic raw material in the region, prime cost of ore development as well as number of open pits for sand and clay production in the region on the volumes of involved associate raw material of the titanium-zirconium open pits are identified. Practical implications. A structural-logical scheme is elaborated for the selection of a resource-saving technology while operating open pits for the development of titanium-zirconium deposits.
1 January 2021 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To substantiate a rational schedule for the combined dragline-truck operation taking into consideration a coefficient of mining in the context of the pit. Methodology. Mathematical and graphical modeling was involved while determining a coefficient of mining concentration in the pit as well as feasibility analysis to select a rational procedure scheme for dragline operation. Findings. Recommendations for the selection of rational dragline operation, while truck loading in the context of Motronivsko-Annivskyi pit, have been developed taking into consideration mining concentration degree in the pit. It has been determined that bottom dragline unloading into a truck, located in the central part of bench mining width, as well as the dragline position at 0.5 A distance from the bench crest, is the most efficient plan of action for the conditions. Technological scheme to develop Motronivsko-Annivskyi pit has been proposed. Originality. Dependence of the mining concentration in the pit upon the parameters of development system elements according to different technological schemes has been derived. The dependence helps estimate development cost for overburden rocks using draglines with direct unloading into trucks. Practical value. Technological schemes for the combined dragline dump truck operation have been developed. Their use makes it possible to cut the prime cost of overburden activities. Implementation of the proposed solutions helps cut stripping cost by UAH 79.65 million a year if annual overburden volume is Qrozkryvu - Qstripping = 13.5 million m3/year.
30 October 2022 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To establish the optimal parameters of the bench elements and slopes of the pit at the mining of Horishne-Plavnynske and Lavrykovske deposits of ferruginous quartzites for further use of these parameters at the design. Methodology. Methods for determining the influence of the bench height on the productive pit capacity involves taking into account the quality of the ore, the rate of the mining front advancement, the rate of pit depth at the mining operations, the total length of the mining front, as well as the angles of the working and non-working pit slops. Findings. The most effective parameters for mining benches and slopes of an iron ore pit are considered, using the example of the Ferrexpo Poltava Mining. Parameters of the bench elements with a height of 2430 m have been established, which are worked out in layers with a height of 12, 10 and 15 m. The studies carried out made it possible to establish that layers with a height of 10 m, followed by the final and temporary pit contour with a bench height of 30 m, can improve safety due to the flattened slope of the pit up to 45, while, with a bench height of 15 m, the angle of inclination of the slope will be 47. Originality. The established dependence of the pit ore productivity in percentage on the bench height suggests that with an increase in the bench (layer) height, the ore productivity of the pit decreases. Determination of the influence of the working bench (layer) height on the total volume of ore losses in the design contour of the pit makes it possible to assert that at constant angles of the bench slope and the ore deposit fall, the values of operating losses and clogging change in direct proportion to the height. Practical value. A technological scheme has been developed for the development of a bench with a height of 30m with a layer thickness of 10 m, which makes it possible to improve safety in the pit by pit slope flattening to 45, to reduce the cost of ore mining by optimizing drilling operations (shorter drilling time per well, reduction of overdrilling and etc.) and thereby improve the economic performance of the enterprise.
23 December 2023 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To justify the parameters of the technological scheme of working out an advanced overburden bench by a bucket-wheel excavator, to reduce the cost of overburden work at Pit 7 of Vilnohirsk Mining and Metallurgical Plant. Methodology. Setting the parameters of the technological scheme of the bucket-wheel excavator was performed by the graphic-analytical method, which involves taking into account the technical characteristics of the mining machine, the physical and mechanical properties of the mining rocks and the stable slope angle of the advanced overburden bench. The substantiation of the effectiveness of application of the technological scheme with a forward trench was made by the technical and economic calculation of the specific costs on overburden works. Findings. The possibility of increasing the height of the overburden bench when using a technological scheme with a forward trench was evaluated. Reasonable parameters of the forward trench, in which the bucket-wheel excavator can develop a forward pit bench with a capacity of 40 m with a stable slope angle of 30°. This allows reducing the amount of mining haulage equipment and reducing overburden costs by up to 50 %. Originality. The minimum slope angle of the overburden slope at the maximum digging height of the ERShR-1600-40/7 excavator, which is equal to 40° at a slope height of 40 m, was established. The dependence of the resulting slope angle of on the re-excavation coefficient of the mining rock mass was established. This makes it possible to assert that when this angle is increased the re-excavation rate will decrease. It was established that at the applying technological scheme with a forward trench in the conditions of Vilnohirsk MMP, the coefficient of overburden re-excavation will be k = 0.09. Practical value. A technological scheme for the development of an advanced overburden bench by the bucket-wheel excavator with a forward trench allows increasing its developed bench height. This makes it possible to reduce the operational cost for overburden works by refuse from haulage mining system with dump trucks.
29 February 2024 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To determine the efficiency of the cyclic flow technology at the development of non-ore deposits depending on the location of haulage level, mobile crushing and sorting plants with variable productivity of the enterprise. Methodology. The research implemented the following methods: analytical method – to establish the dependence of the required number of dump trucks at the enterprise on the depth of non-ore quarry development at a given annual productivity; simulation modelling – to determine the influence of the mining depth of a non-ore quarry on the haulage distance of mining mass to the surface of the quarry. Findings. The performance indicators of the haulage system for the development of a non-ore quarry using dump trucks and conveyor transport in combination with a mobile crushing complex, as well as a mobile crushing and sorting plant on the haulage level, were determined. It was established that the use of cyclic flow technology with a mobile crushing complex on the haulage level allows reducing the haulage distance by 1.9 times at a quarry depth of 150 m. Originality. The dependence of the dump trucks productivity and their required number on the depth and production capacity of a non-ore quarry when using the haulage mining system was established. It was determined that an increase in the quarry depth from 50 to 150 m will lead to an increase in the number of dump trucks by 2.6 to 3.6 times, depending on the quarry productivity. At the same time, the use of cyclic flow technology with a mobile crushing complex in the quarry allows increasing the productivity of dump trucks by 2.1 times from 94.1 to 197.6 thousand tons/year due to the reduction of the haulage distance of dump trucks from 2525 to 575 m. Practical value. A methodology for determining the impact of the quarry depth on the parameters of the mining haulage complex has been developed when using the technique of cyclic and current action on non-ore raw material quarries, which takes into account the location of the mobile crushing and sorting plant, changes in the depth and annual productivity of the quarry, its area and parameters of the trenches. The indicators of the cyclical-flow mining technology, necessary for the further technical and economic assessment of the proposed solutions, have been established.
The paper examines the technological scheme for granite mining with the use of rock chutes in the conditions of the Rybalsky Quarry. The research purpose is to substantiate effective technological schemes for mining the upper granite quarry horizons to reduce mining costs and improve the final product quality. Research is conducted using: the method of scientific analysis, theoretical research and practice of project and production organizations; mining-geometric calculations; variant method for comparing and selecting technological schemes for mineral mining. As a result, the dependence of the transportation cost of 1 ton of mineral on the transportation distance has been determined, due to which it became possible to assess the effectiveness of using rock chutes in the conditions of the Rybalsky Quarry. The dependence of the rock chute inclination angle on the friction coefficient when rolling down the mined mass has been revealed, which substantiates the rational inclination angle of the rock chute for quarry conditions. Practical value of the research results consists in reducing the cost of transporting minerals from the upper quarry horizons by applying a technological scheme with the mined mass movement using rock chutes.