Melih Iphar

Dr. Melih Iphar

orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2009 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
HAHakan Ak
Hakan Ak
MIMelih Iphar
Melih Iphar
MYMahmut Yavuz
Mahmut Yavuz
AKAdnan Konuk
Adnan Konuk


1 February 2006 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
MIMelih Iphar
Melih Iphar
RGR.M. Goktan
R.M. Goktan

1 January 2012 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
MIMelih Iphar
Melih Iphar

2 April 2018 in International Journal of Occupational Safety and Ergonomics
Verified
Journal Article
Closed access
MIMelih Iphar
Melih Iphar
ACAli Kivanc Cukurluoz
Ali Kivanc Cukurluoz
The decision matrix method is preferred as a measure of risk evaluation considering the risk value obtained by two risk factors such as the likelihood and severity of a hazard. However, it has some deficiencies since a crisp risk score is assigned for likelihood and severity. In this article, a fuzzy logic-based safety evaluation method to enhance the risk assessment process is introduced to overcome the uncertainties encountered in the classical decision matrix risk assessment method. The proposed method is a more realistic evaluation of the risks which may be available in mechanized coal mines in Turkey. In this way, risky situations and operations in mechanized underground coal mines have been determined by expert knowledge and engineering judgement in linguistic forms. Thus, such an evaluation will be a valuable guide for coal mines in which fully mechanized coal production is expected in the near future.

1 March 2008 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
MYMahmut Yavuz
Mahmut Yavuz
MIMelih Iphar
Melih Iphar
GOGuner Once
Guner Once