Robust and reliable forecasting of renewable energy generation is essential for managing grid stability, optimising energy resources, and meeting global climate targets, such as the European Union’s goal of achieving Net-Zero greenhouse gas emissions by 2050. Renewable energy sources, including solar, wind, and tidal, are inherently variable and difficult to predict, while hydro is comparatively more stable but still subject to seasonal and climatic fluctuations. This variability poses significant challenges to grid operators and policymakers striving to integrate more renewable energy into the power system. Prediction Interval (PI), which quantifies uncertainty by providing a probabilistic range of potential outcomes, offer a solution to this problem by enhancing the reliability and accuracy of renewable energy forecasts. This paper reviews the methodologies for estimating prediction interval, including statistical, machine learning, and deep learning approaches, and demonstrates how these techniques can address the key challenges in renewable energy forecasting. By offering a structured comparison of prediction interval estimation methods across different renewable energy sectors, the paper highlights their potential to reduce uncertainty, improve decision-making for grid integration, and assist policymakers in developing strategies to mitigate risks from energy variability. Moreover, the review identifies critical gaps in current research and proposes future directions that could further refine Prediction Interval estimation methods for greater accuracy and applicability. The insights provided in this review can aid scientists, engineers, and decision-makers in advancing renewable energy forecasting techniques, thereby accelerating the transition toward a more sustainable and resilient energy system.
Precise and dependable wind power prediction is crucial for maintaining grid stability and ensuring operational efficiency. Despite this, current prediction interval (PI) techniques, particularly conventional Lower Upper Bound Estimation (LUBE), focus primarily on optimising statistical width and coverage. These methods typically produce symmetric intervals and fail to account for practical operational risks like storage overflow and backup power shortages. To address this limitation, this study introduces a Cost-Sensitive and Feature Representation-Enhanced LUBE framework. Specifically, the method utilises a newly developed cost function featuring asymmetric penalties tailored to oversupply and shortage risks, which actively directs how the intervals are positioned instead of just assessing them post-hoc. In parallel, PCA, KPCA, t-SNE, UMAP, and Autoencoders are investigated as dimensionality-reduction and representation techniques to construct compact inputs and reduce redundancy. Additionally, a Gated Recurrent Unit (GRU) network forecasts short-term extreme values (MaxPower and MinPower), which are incorporated as auxiliary inputs under multiple historical lag configurations (, , ). Through this integrated architecture, the system can simultaneously learn the uncertainty boundaries, the importance of specific features, and its sensitivity to operational risks. Experiments using SCADA data from a Vestas V52 wind turbine demonstrate improved prediction interval quality together with fewer proxy directional violations. At the lag, the Prediction Interval Coverage Probability (PICP) increases from 94.56% to 95.40%, while the Coverage Width-based Criterion (CWC) decreases from 15.74 to 11.99. The proposed framework, therefore, provides a lightweight approach for improving statistical interval quality while incorporating asymmetric directional preferences into LUBE training.
The research contributes to the study of the automated guided vehicle (AGV) utilisation, specifically the number of AGVs involved with different industrial time intervals. Computation of the number of AGVs depends upon the assigned tasks of different time intervals such as loaded and unloaded travel times, loading, and unloading times, return travel, and the completion period. There has been an effort to manage the current research gap in existing studies and help the industry sector to estimate the minimum number of AGVs. Modernisation left an impact on the industry too; this research offers additional knowledge toward the manufacturing sector, particularly how automated guided vehicles can easily deploy with minimum effort, as they are flexible and easily can move on a variety on paths. This research study describes an algorithm for AGV formulation based on the transport time factors, to perform different jobs in any industry. The current COVID pandemic also highlights the importance of robots and digitalisation to compete with such disasters, little effort has been devoted to computing with agent-based simulation, to compare the finding with calculated values. We address the difficulties and demonstrate how many AGVs are required to meet the industry requirement.